At sea, the nearest hospital may be days away, so the crew are the first and often only medical responders. They need the right guides, a properly stocked medicine chest, trained people and a fast line to a doctor ashore. This guide covers the Medical First Aid Guide (MFAG) for dangerous goods exposures, the International Medical Guide for Ships, medicine chest inventory and inspection, telemedical advice and the records that support onboard care. Book a demo to track medical stores and inspections.
Ship medical first aid and MFAG: ready to treat far from shore
MFAG and the International Medical Guide for Ships
Ships carry more than one medical reference, each with a different job. Bahamas Maritime Authority guidance lists the required publications.
| Publication | What it covers | When to use it |
|---|---|---|
| International Medical Guide for Ships (IMGS) | General illness and injury care on board, medicine chest contents, medical report form | Most illness and injury cases |
| Medical First Aid Guide (MFAG) | First aid and treatment for exposure to dangerous goods, with antidotes and oxygen | Chemical exposure from cargo or stores |
| International Code of Signals, medical section | Standard phrases for medical advice by radio | When language or signal quality is a problem |
MFAG is published with the IMDG Code Supplement. Some flags accept equivalents to the IMGS, such as approved apps or guides; check your flag.
Who provides medical care on board
The Maritime Labour Convention and STCW set who must be able to give care, depending on crew size and distance from shore.
From Bahamas Maritime Authority Marine Notice 40. Ships with 15 or more persons on voyages over three days also need a separate hospital space.
Using MFAG after a dangerous goods exposure
A chemical exposure needs fast, correct action, and the wrong first aid can make it worse. The outline below shows the typical flow; always follow the MFAG and the safety data sheet for the substance.
Identify
Find the substance and UN number from the cargo documents and safety data sheet.
Protect and remove
Rescuers in proper protective equipment move the casualty out of exposure.
Decontaminate
Remove contaminated clothing; flush skin or eyes as the guide directs.
Treat by MFAG
Follow the MFAG entry for the exposure, including oxygen and any antidote.
Get advice
Contact telemedical advice early, with the substance details at hand.
If a cargo is not covered by the current MFAG, the company must give the ship information on risks, protective equipment, treatment and antidotes.
Medical chest inventory and inspection
The medicine chest must be inspected at least every 12 months, and recorded. Bahamas Maritime Authority Marine Notice 41 sets out a practical inventory regime.
Inventory
- Every item with quantity, expiry date and storage condition
- Replace items within three months before expiry
- Expired items locked away until returned or disposed of, with receipts
- Extra MFAG medicines and equipment when carrying dangerous goods
Controlled drugs and oxygen
- Controlled drugs in a separate locked cupboard or the master’s safe
- Controlled Drug Register kept for two years after the last entry
- Oxygen sets with spare cylinder and flow meter on ocean-going ships
- Oxygen cylinders hydrostatically tested at least every five years
Medical stores categories from Bahamas Marine Notice 41. Category determines the required contents.
No expired medicines at the next inspection
Track every item in the medicine chest by expiry date, get alerts three months ahead, and keep inspection certificates on file.
Telemedical advice: getting a doctor on the line
Telemedical Maritime Assistance Services (TMAS) give free medical advice to ships at sea. Ships should carry a current list of stations that provide medical advice.
2025 TMAS collaborative report
Top reasons for calls: digestive and dental, musculoskeletal, skin, and general enquiries. Data from TMAS services in nine countries, reported by the Seafarers’ Trust.
Have this ready before calling
- Ship name, position, destination and time to nearest port
- Patient age, sex, symptoms and when they started
- Vital signs: pulse, breathing, temperature, blood pressure
- Medicines given, allergies and medical history
- Medicine chest list, to agree what can be used
Medical records on board
Medical emergency drills
SOLAS enclosed space rescue drills include first aid and resuscitation, and many companies add casualty handling to fire and abandon ship drills. Practising before a real case makes a big difference. For drill planning, see our SOLAS emergency drill guide.
Onboard medical readiness checklist
Use this before medical chest inspections and MLC or PSC checks.
How Marine Inspection tracks medical stores
Marine Inspection keeps the medicine chest inventory by item and expiry date, schedules inspections, and tracks training and drills. It sits within our crew safety inspection module. The timeline below is illustrative.
Onboard medical care FAQs
What is the MFAG?
The Medical First Aid Guide for Use in Accidents Involving Dangerous Goods. It gives first aid and treatment for chemical exposures and is published with the IMDG Code Supplement.
How often must the medicine chest be inspected?
At intervals not exceeding 12 months, by a person certified by a medical authority or a competent officer, and recorded.
When does a ship need a doctor?
Ships carrying 100 or more persons on international voyages longer than three days must carry a qualified doctor under MLC 2006.
What is TMAS?
Telemedical Maritime Assistance Services give free medical advice to ships. In 2025, 60.2% of cases in a nine-country report were treated on board.
How should controlled drugs be stored?
In a separate locked cupboard or the master’s safe, with a Controlled Drug Register kept for two years after the last entry.
Can Marine Inspection track medical stores?
Yes. Book a demo to see medicine chest expiry tracking and inspections.
Care that reaches the crew, wherever the ship is
The right guides, a stocked chest, trained people and a doctor a call away, all checked and on record.