IMO & SOLAS Ready

Marine Vessel Inspection Management

Simplify IMO & SOLAS compliance checks with comprehensive digital inspection tools. Capture images, notes and digital signatures for complete vessel audits — and keep every fleet regulatory-ready with streamlined inspection workflows.

1800+Marine Operators
25,000+Vessel Inspections Completed
Marine Inspection Features

Comprehensive Vessel Inspection Tools

Digital tools for thorough vessel inspections — IMO and SOLAS compliance with complete audit trails for classification societies and port state authorities.

Machinery Space Inspections

Comprehensive engine room and machinery space inspections — main engines, auxiliary systems, pumps, generators and propulsion equipment with photo documentation and defect tracking for marine engineers.

Pre-Departure Safety Checks

Vessel readiness with pre-departure checklists covering navigation equipment, safety gear, communication systems, life-saving appliances and crew preparedness — with digital signature capture for masters and deck officers.

Hull & Structure Surveys

Detailed hull integrity assessments — plating examination, corrosion monitoring, coating condition surveys, tank inspections and structural member evaluations with photo annotations and measurement recording for surveyors.

Surveyor-Ready Mobile Solution

Marine Inspection Mobile App

Empower your marine surveyors and inspectors with a mobile app designed for vessel inspections — offline capable, with instant sync:

  • Complete digital vessel inspection forms with photo documentation offline
  • Capture defects, measurements and equipment readings automatically
  • Report safety violations, structural defects and equipment failures with voice notes
  • Access vessel specifications, previous inspection history and classification records
  • Submit inspection certificates with digital signatures and photos
  • Real-time communication with ship masters and shore management
Marine Inspection AI mobile app — inspection reports screen
Machinery Inspection

Comprehensive Engine Room & Machinery Space Inspections

Detailed machinery space inspections with structured checklists covering all critical propulsion and auxiliary systems:

  • Main propulsion engine inspection with cylinder, fuel and cooling system checks
  • Auxiliary generators, emergency generator and electrical distribution systems
  • Pumps, compressors, separators and fluid transfer equipment inspection
  • Boilers, heat exchangers and thermal management systems evaluation
  • Ventilation, bilge and fire suppression system functionality verification
  • Photo documentation of equipment condition and defect tracking
Pre-Departure Inspection

Essential Safety Checks Before Vessel Departure

Comprehensive pre-departure safety checklists covering every critical system before sailing:

  • Navigation equipment verification including GPS, radar, AIS and ECDIS systems
  • Life-saving appliances check — lifeboats, life rafts, life jackets and immersion suits
  • Fire detection and suppression systems testing with extinguisher verification
  • Communication systems test including VHF, GMDSS, satellite and emergency equipment
  • Crew readiness verification with safety briefing and muster station confirmation
  • Digital signature capture from master, chief officer and chief engineer
Hull Inspection

Structural Integrity & Hull Condition Surveys

Comprehensive hull surveys with detailed structural assessments and corrosion monitoring:

  • Hull plating examination with thickness measurement and corrosion assessment
  • Structural member inspection including frames, stiffeners and longitudinals
  • Bulkhead and deck condition evaluation with watertight integrity verification
  • Tank inspection and coating system condition survey with photo documentation
  • Weld seam examination and critical area focused inspection procedures
  • Photo annotation tools for defect marking and measurement recording
Deck Inspection

Deck Equipment & Cargo Handling Gear Inspection

Comprehensive deck inspection tools covering cargo handling equipment, mooring systems and weather deck integrity:

  • Cargo handling equipment inspection including cranes, winches and derricks
  • Mooring and anchoring equipment evaluation with chain and rope condition checks
  • Hatch cover inspection with seal condition and drainage system verification
  • Deck fittings, railings and safety equipment condition assessment
  • Weather deck integrity check with corrosion and coating condition monitoring
  • Load testing verification and safe working load documentation
Success Stories

Trusted by Maritime Professionals Worldwide

“Marine Inspection has revolutionized our vessel inspection process. We've reduced inspection time by 65% while maintaining perfect SOLAS compliance across our fleet.”

Captain James MitchellFleet Manager — Pacific Shipping Lines

“The digital signature feature and real-time reporting have eliminated paperwork delays. Port state inspections are now a breeze with all documentation instantly accessible.”

Sarah ChenMarine Superintendent — Global Container Corp

“Outstanding support for IMO regulations. The system automatically updates with new requirements, keeping our entire fleet compliant without manual tracking.”

Chief Engineer OlsenTechnical Director — Nordic Maritime Services

Start simplifying vessel inspections today!

Join thousands of maritime professionals using Marine Inspection AI to ensure compliance and improve vessel safety.

Mobile App

Offline ModePhoto CaptureVoice Notes Digital FormsReal-time Sync

Web Dashboard

Fleet OverviewAnalytics SuiteReport Builder Compliance TrackingDocument ManagerCloud-Based
Open the Web Portal