A disabled tanker drifting towards a coast has hours, not days, before a tug must connect. The emergency towing arrangement exists so that connection can be made quickly, in bad weather and possibly with no power on board. This guide covers who needs an ETA, its components fore and aft, strength and deployment rules, the emergency towing booklet every ship must carry, and how to inspect and practise so the gear works when needed. Book a demo to track ETA inspections.
Ship emergency towing arrangement (ETA): ready to connect in 15 minutes aft, one hour forward
Who needs an emergency towing arrangement
The rules differ for tankers and other ships, and a change is coming for large non-tankers.
ETA at both ends
Oil, chemical and gas tankers, required since 1996 for new ships and by 1999 for existing ones. Now in SOLAS regulation II-1/3-4.
Emergency towing procedures
Ship-specific procedures, usually an emergency towing booklet, required for passenger ships from 2010 and all cargo ships by 2012.
Large non-tankers
New ships other than tankers of 20,000 GT and above will need ETAs, with towing load based on equipment number (amendments MSC.549(108)).
From Gard, Transport Malta Technical Notice SLS.16 and Riviera’s report on IMO SDC 11. Check the final text and your flag for application dates.
ETA components: forward and aft
| Component | Purpose | Aft | Forward |
|---|---|---|---|
| Pick-up gear | Messenger line and buoy that the tug picks up | Required | Optional |
| Towing pennant | Wire or rope connecting the tug’s line to the ship | Required | Optional |
| Chafing gear | Chain or protection where the line passes the fairlead | Required | Chafing chain |
| Fairlead | Closed guide where the tow leaves the ship | Required | Required |
| Strongpoint | Bracket or stopper that takes the towing load | Required | Required |
| Roller pedestal | Guides the pennant during deployment | Required | As fitted |
Component list for tankers as summarised by Gard from IMO guidelines MSC.35(63).
ETA strength and geometry rules
IMO guidelines set strength by tanker size and fix minimum lengths so the tow clears the ship’s side.
Towing pennant length
At least twice the lightest seagoing ballast freeboard at the fairlead, plus 50 m.
Illustrative example.
Chafing chain
Where chain is used, it is fixed to the strongpoint and extends at least 3 m beyond the fairlead.
Know every ETA component is ready
Log condition checks for pick-up gear, pennant, chafing chain, fairlead and strongpoint, with photos and next due dates.
Pick-up gear and aft deployment
The aft ETA must be deployable within 15 minutes in harbour conditions, and its pick-up gear releasable by one person. The forward arrangement is allowed up to one hour.
General outline. Follow the ship’s emergency towing booklet and maker’s instructions.
ETA inspection: what to check
IMO sets the design rules; keeping the gear ready is a planned maintenance task. These suggested checks reflect common good practice.
Pick-up gear and buoy
Rope dry and undamaged; buoy light working and battery in date; release mechanism free.
Towing pennant
No broken wires, kinks or corrosion; ends and thimbles sound; stowage protected.
Chafing chain
No excessive wear or pitting; links and shackles secure; pins seized or moused.
Fairlead
Surface smooth, no sharp edges or cracks; clear of obstructions.
Strongpoint
Bracket and welds free of cracks and wastage; locking device working; SWL marked.
Deck access
Route clear, lighting working, tools for connection stowed nearby.
The emergency towing booklet
IMO guidance MSC.1/Circ.1255 describes a ship-specific booklet that crews can use under pressure.
What it contains
- Ship data: name, call sign, IMO number, anchors and cables, deck heights, draft and displacement
- Towing points with safe working loads and rigging diagrams
- Decision matrix, crew organisation and tasks
- Procedures for dead-ship and power loss
- Communications plan with the towing vessel
At least three copies on board
Plus an electronic copy and one held by the company.
Emergency towing drills and familiarisation
IMO guidance says towing procedures should be practised beforehand because an emergency leaves no time to think, but it does not set a drill frequency. Many companies set one in their SMS. For drill planning, see our SOLAS emergency drill guide.
Emergency towing arrangement checklist
Use this for routine ETA checks and before PSC or vetting inspections.
How Marine Inspection tracks ETA readiness
Marine Inspection gives each ETA component a record with condition, photos and next check date, links the towing booklet, and logs familiarisation. It fits alongside our crew safety inspection module. The tracker below is illustrative.
Aft
Forward
Emergency towing arrangement FAQs
Which ships need an emergency towing arrangement?
Tankers of 20,000 dwt and above need ETAs at both ends. New non-tankers of 20,000 GT and above will need them from 1 January 2028.
How quickly must the ETA be deployed?
The aft arrangement within 15 minutes and the forward within one hour, in harbour conditions.
What strength must a tanker ETA have?
A working strength of 1,000 kN for tankers of 20,000 to 50,000 dwt, and 2,000 kN for larger tankers.
Do all ships need emergency towing procedures?
Yes. SOLAS requires ship-specific emergency towing procedures, usually as a booklet kept on the bridge, forecastle and office.
How often should ETA drills be held?
IMO does not set a frequency, but advises practising beforehand. Companies usually set an interval in their SMS.
Can Marine Inspection track ETA inspections?
Yes. Book a demo to see ETA component records and checks.
Ready to be towed, when it matters
Gear in condition, a booklet the crew can use and a team that knows the route, checked and on record.