Paperless & IMO Ready

Digital Logbook for Marine Operations

Replace paper logs with comprehensive digital logbook software. Capture voyage data, engine readings, fuel consumption, and crew information electronically. Ensure compliance with maritime regulations through automated record-keeping and multi-user access.

2800+Vessels Using
180,000+Log Entries Recorded
Digital Logbook Features

Complete Electronic Log Management

Electronic tools for recording voyage data, engine readings, fuel consumption, and crew information — ensuring IMO compliance and maintaining comprehensive audit trails.

Engine Room Operations

Comprehensive engine room logging — main engines, auxiliary systems, pumps, generators and propulsion equipment with digital entries and timestamped records for marine engineers.

Voyage Documentation

Complete voyage documentation with electronic logbook entries covering position reports, weather observations, navigation events and passage planning — with GPS integration for deck officers.

Crew Management

Detailed crew management — watch schedules, training records, rest hour compliance, certificate tracking and crew list management with multi-user access for all officers.

Engine Logbook

Digital Logbook Mobile App

Empower your marine officers and engineers with a mobile logbook app designed for electronic record-keeping — offline capable, with instant sync:

  • Record main engine parameters including RPM, temperatures, pressures and running hours
  • Log auxiliary machinery readings including generators, pumps and compressors
  • Document oil consumption, water levels and fluid transfer operations
  • Track maintenance activities, filter changes and equipment servicing
  • Automatic calculations for fuel consumption rates and efficiency metrics
  • Export engine logs for regulatory compliance and performance analysis
Fuel Logbook

Fuel Consumption Tracking & Bunkering Records

Detailed fuel consumption tracking for marine vessels with electronic logging covering all fuel operations and bunkering activities:

  • Daily fuel consumption recording with automatic ROB calculations and efficiency metrics
  • Bunkering operation records with quantity received, grade and delivery note details
  • Fuel transfer operations logging with tank soundings before and after transfers
  • Tank level monitoring with daily soundings and temperature-corrected volumes
  • Fuel changeover records for ECA compliance with sulphur content documentation
  • Export fuel reports for MARPOL Annex VI and emissions data collection
Voyage Logbook

Document Voyage & Navigation Events

Comprehensive voyage documentation including position reports, weather conditions, and navigational events:

  • Automatic noon reports with GPS position, course, speed and distance made good
  • Weather observation logging including wind, sea state, visibility and barometric pressure
  • Port arrival and departure records with pilot information and berth details
  • Navigation events including course changes, traffic separation schemes and pilot stations
  • Master's standing orders and night order compliance documentation
  • Voyage planning notes and passage plan waypoint tracking
Crew Logbook

Watch Schedules, Training Records & Certificates

Comprehensive crew management with multi-user access for watch schedules, training records, and certificate tracking:

  • Watch schedule tracking with bridge, engine room and duty roster assignments
  • Training and drill records including fire drills, boat drills and emergency procedures
  • Certificate tracking with expiry dates for STCW, medical certificates and endorsements
  • Work/rest hours recording ensuring compliance with MLC 2006 requirements
  • Crew list management with sign-on/sign-off records and contact details
  • Multi-user access with role-based permissions for master, officers and crew
Success Stories

Trusted by Maritime Professionals

“The digital logbook system has transformed our operations. PSC inspections are now seamless with instant access to all records. Time saved is incredible.”

Captain Karl AndersonMaster — MV Atlantic Progress

“Multi-user access changed everything. Shore team can monitor operations real-time. The voice-to-text feature during busy periods is invaluable.”

Lisa WongFleet Operations Manager — Asia Pacific Lines

“Perfect ORB compliance every time. The automated calculations and code validation eliminated all errors. Worth every penny for peace of mind.”

Chief Eng. Petros GeorgiosC/E — Mediterranean Tankers

Go paperless today!

Join thousands of vessels using Marine Inspection digital logbooks for compliant, efficient record-keeping.

Mobile Logbook

Quick EntryVoice NotesPhoto Attach Offline ModeAuto Sync

Analytics Portal

Log AnalysisTrend ReportsExport Tools Audit ReportsData InsightsBlockchain Secured
Open the Web Portal