Enclosed spaces still kill seafarers every year, and too often the second death is the person who rushed in to help. A rescue that works is planned before anyone goes in: the right gas detector, breathing apparatus, a retrieval system rigged and a team that has practised. This guide covers SOLAS drill requirements, IMO’s revised entry recommendations, gas detection, rescue equipment and how to run a rescue drill that builds real readiness. Book a demo to track rescue drills and equipment.

Enclosed space rescue · drills, equipment, training

Ship enclosed space rescue: don’t let one casualty become two

Untrained response
Casualty collapsesCrewmate goes straight inSecond casualty
Trained response
Raise the alarmTest and equipPlanned rescue

Why enclosed space rescue still matters

InterManager has tracked enclosed space incidents since 1998. Its recent figures show the problem has not gone away.

34casualties from 14 incidents in 2023, up from 18 in 2022
14deaths from 11 accidents in 2024 (initial figures): 8 seafarers, 6 contractors
51%of life-threatening incidents or deaths in holds and hold access areas
41%of incidents on bulk carriers; tankers next at 23%

InterManager figures published March 2025.

IMO’s revised recommendations for entering enclosed spaces

IMO resolution MSC.581(110), adopted in June 2025 and endorsed by the IMO Assembly in December 2025, replaced resolution A.1050(27). Its main changes affect rescue planning directly.

Ship-specific register

An Enclosed Space Register listing each space, including connected and adjacent spaces.

Emergency response plan

A ship-specific Enclosed Space Emergency Response Plan with roles, equipment and communications.

No single-person entry

Nobody enters alone; permits valid for no more than 8 hours.

CO2 measured

Oxygen, CO2, flammable and toxic gases tested before entry.

EEBDs for escape only

Escape sets must never be used to enter a space.

Marked access

Access points marked safe or unsafe for entry.

Summary from ABS regulatory news and Cyprus Shipping News. MSC.581(110) is a recommendation; flag requirements may make parts mandatory.

SOLAS enclosed space rescue drill requirements

SOLAS Regulation III/19 requires crew with enclosed space entry or rescue duties to take part in an entry and rescue drill at least once every two months. For the full drill calendar, see our SOLAS emergency drill guide.

2months maximum between drills for entry and rescue crew
1Checking and use of personal protective equipment
2Communication equipment and procedures
3Instruments for measuring the atmosphere
4Rescue equipment and procedures
5First aid and resuscitation techniques

Drill elements from SOLAS III/19.3.6. Drills should be planned and conducted safely, taking IMO recommendations into account.

Gas detection before entry and rescue

SOLAS Regulation XI-1/7 requires ships to carry handheld atmosphere testing instruments. Under MSC.581(110), entry is not allowed until all readings are within these limits.

O220.9% or moreOxygen
CO2Below 0.5%5,000 ppm
LFLBelow 1%Flammable gases
ToxicBelow 50% OELSuch as H2S and CO
Calibrate and bump testTo the maker’s schedule; record it
Test at levelsTop, middle and bottom, and remote corners
Monitor continuouslyPersonal detectors worn during entry and rescue
Match the cargoDetectors suited to cargoes carried, including CO2

Thresholds as summarised by ABS. Check MSC.581(110) and your SMS for full criteria.

Every two months, every rescuer, on record

Schedule rescue drills by crew member, log equipment checks and gas detector calibration, and review the response plan after each drill.

Enclosed space rescue equipment

Rescue equipment should be ready at the access point before entry starts, not fetched after a collapse.

Retrieval system

Tripod or davit with winch rated for people, rigged over vertical access.

Rescue harness

Full-body harness with lifeline attachment, worn by each entrant.

SCBA for rescuers

Self-contained breathing apparatus, never EEBDs, for rescue entry.

Rescue stretcher

Designed for vertical lifts through narrow openings.

Communications

Intrinsically safe radios and agreed signals between entrants and attendant.

First aid and resuscitator

Oxygen resuscitator and first aid kit at the access point.

Running an enclosed space rescue drill

A realistic drill uses a weighted dummy in a real space and follows the ship’s emergency response plan. The sequence below is a typical outline.

1AlarmAttendant raises the alarm and does not enter
2MusterRescue team and equipment to the access point
3TestAtmosphere checked; ventilation started
4Rig and donTripod set up; rescuers in SCBA and harness
5Enter in pairsComms checked; standby team ready
6RecoverCasualty secured in stretcher and lifted out
7First aidOxygen and resuscitation practised
8ReviewTimes, problems and plan changes recorded

Run drills safely: the drill itself must not expose people to a hazardous atmosphere.

Entry permit and rescue readiness

Rescue readiness belongs on the entry permit. Before signing, the officer should confirm the rescue arrangements, not just the gas readings.

✓Space in the Enclosed Space Register; risks assessed
✓Atmosphere tested and within limits; monitoring planned
✓Attendant at the entrance with communications
✓Rescue team named and briefed
✓Retrieval system and SCBA at the access point
✓Permit valid for no more than 8 hours

Enclosed space rescue checklist

Use this before each rescue drill and each entry.

How Marine Inspection supports enclosed space rescue readiness

Marine Inspection keeps the enclosed space register, schedules two-monthly rescue drills by crew member, logs equipment and gas detector checks, and links drill lessons to the response plan. It sits within our crew safety inspection module. The register below is illustrative.

Enclosed Space Register · MV example bulk carrierNext rescue drill: 04 Nov
SpaceMain hazardLast drill hereStatus
Cargo hold 3Oxygen depletion from cargoAug 2026Ready
Forward storeConnected to hold accessNeverPlan drill
Ballast tank 2PLow oxygen, corrosionJun 2026Ready
CO2 roomCO2 leakSep 2026Detector due
Ship-specific registerDrill by crew memberDetector calibrationPlan review after drills

Enclosed space rescue FAQs

How often are enclosed space rescue drills required?

At least once every two months for crew with enclosed space entry or rescue duties, under SOLAS Regulation III/19.

What must a rescue drill include?

Use of protective equipment, communications, atmosphere testing instruments, rescue equipment and procedures, and first aid and resuscitation.

What replaced IMO resolution A.1050(27)?

Resolution MSC.581(110), adopted in June 2025 and endorsed by the IMO Assembly in December 2025.

Can an EEBD be used for rescue?

No. EEBDs are for escape only. Rescuers entering a hazardous atmosphere should use SCBA.

What gases must be tested before entry?

Oxygen, flammable gases, CO2 and relevant toxic gases such as H2S and CO, with readings within the set limits.

Can Marine Inspection track rescue drills?

Yes. Book a demo to see the register, drill schedule and equipment checks.

Plan the rescue before the entry

A tested atmosphere, a rigged retrieval system and a team that has drilled it, every time.