Every SIRE 2.0 report is only as credible as the inspector who wrote it. OCIMF accredits a limited pool of inspectors, and Submitting Companies assign them when they accept an operator’s request. Knowing how that pool is built and how requests move helps you plan inspections realistically. This guide covers SIRE 2.0 inspector accreditation, where “VIES” fits, and what inspector availability means for your booking. Book a demo to keep vetting dates on track.

SIRE 2.0 · inspectors and scheduling

SIRE 2.0 inspector accreditation and assignment, step by step

1OperatorRaises a request in SIRE
2Submitting CompanyUp to five, offered in order
3Accredited inspectorFrom the accepting company’s pool
4InspectionReport to the SIRE database

VIES and the SIRE 2.0 inspection request workflow

“VIES” is used by some operators and service providers to describe vetting inspection scheduling. We could not find it as a named system in OCIMF’s public SIRE documents. The official route is the SIRE inspection request, described below. Our SIRE 2.0 inspector assignment and scheduling guide covers the day-to-day process.

Inspection requestLive for 2 weeks, or until accepted
1Submitting Company A
2Submitting Company B
3Submitting Company C
4Submitting Company D
5Submitting Company E
AcceptedInspection commissioned; request closes
All declineOperator is notified and can raise a new request

From OCIMF’s SIRE inspection request bulletin. The operator sets the list and its order.

SIRE 2.0 inspector accreditation: who can become an inspector

OCIMF runs accreditation, but every applicant must be nominated by a SIRE Submitting Company that is also an OCIMF member. The nominating company checks documents, integrity and fitness. There are two categories.

Category 1

Ocean-going tankers

  • STCW certificate II/1, II/2, III/1 or III/2, or an approved equivalent role
  • Advanced dangerous cargo training for the ship types sought
  • ISO or ISM auditor course
  • 60 months as an officer on ships over 3,000 GT, with 18 months in a senior tanker rank
Category 3

Barges and smaller craft

  • Watchkeeping, small-ship Master or Second Engineer certificate, or a barge licence
  • Two years’ sea time on the relevant type, or appropriate training
  • English plus the crew’s spoken language
  • Physically able to carry out a full inspection

Inspector competency: sea service and equivalent experience

For Category 1, some shore roles can count towards sea service. Up to 6 months of the 18-month senior rank requirement can come from equivalent roles. FSO and FPSO service counts at half for overall sea time and not at all for senior rank.

Overall sea service
60 months
Senior tanker rank
18 months
Equivalent roleSea service credited
Vetting Superintendent (Submitting Company)18 months
Ship Superintendent (tankers)18 months
PSC Inspector18 months
Flag State Inspector24 months
Pilot, Mooring or Loading Master24 months
Terminal Operator24 months
Class Surveyor24 months

From OCIMF’s SIRE inspector accreditation page. A route exists for marine assurance staff with less than 60 months, through a structured company training programme.

The SIRE inspector accreditation path

1NominationBy an OCIMF member Submitting Company
22 accompanied inspectionsBefore the course; more if no endorsement for a ship type
3Face-to-face courseNew inspector courses run in Europe, Asia and the USA
42 more accompaniedOn the ship types sought
5Audited inspectionA successful audited physical SIRE inspection
6Accredited, then reviewedRefreshers, ECDIS course, ongoing performance reviews

Category 1 path. For renewal, OCIMF has replaced physical assessments with performance reviews, prioritised by accreditation expiry.

A request lasts two weeks. Plan around it.

Track request dates, Submitting Company responses and ship readiness in one place, so a declined request never becomes a missed charter.

What inspector accreditation means on board

Accreditation sets a common standard, but the operator still shapes much of the result. For the inspection itself, see our SIRE 2.0 inspection guide.

The inspector does not choose the questions

The questionnaire is compiled from the ship’s pre-inspection data and the question library.

You shape who is asked, not who comes

Operators set the Submitting Company list and order; the accepting company assigns the inspector.

Findings are written before leaving

Negative observations are recorded before the closing meeting; operators then have 14 days for initial comments.

Inspectors are reviewed too

Ongoing performance reviews and refreshers help keep reports consistent across a large pool.

Inspector availability: the size of the SIRE 2.0 pool

OCIMF reported these figures for the first year of SIRE 2.0. The pool is small compared with the number of inspections, and new Category 1 applications for 2026 courses are closed.

460accredited SIRE 2.0 inspectors
22,000+inspections in the first 12 months
~2,100ports where inspections took place
~48inspections per inspector per year, on average

Figures from OCIMF’s one-year SIRE 2.0 review (September 2025). The per-inspector average is our arithmetic, 22,000 divided by 460.

SIRE 2.0 inspection booking and scheduling

You cannot pick the inspector, but you can control almost everything else. The split below helps focus planning effort.

You control
  • When the request is raised and the port chosen
  • Which Submitting Companies are listed, and in what order
  • Accurate HVPQ, PIQ and current photos
  • Ship and crew readiness
  • Quality of comments within 14 days
You do not control
  • Which inspector is assigned
  • Whether a company accepts the request
  • The questions in the questionnaire
  • Inspector availability in a busy port

SIRE 2.0 scheduling checklist

Run this before raising a SIRE 2.0 inspection request.

How Marine Inspection keeps SIRE 2.0 scheduling on track

Marine Inspection logs each request, its expiry date and readiness tasks per ship, and moves straight into observation tracking after the inspection. The tracker below is illustrative.

Request tracker · MV example tankerRaised 6 Oct · expires 20 Oct
1Submitting Company ADeclined
2Submitting Company BAccepted · inspector assigned
3Submitting Company CNot needed
Readiness14 of 16 tasks
PIQ and HVPQPublished
Photos1 group due
Request expiry alertsReadiness tasks14-day comment timerObservation tracking

SIRE 2.0 inspector and VIES FAQs

How are SIRE 2.0 inspectors accredited?

A Submitting Company nominates the applicant, who meets experience and certificate rules, completes accompanied inspections and a course, and passes an audited inspection.

What is VIES in SIRE 2.0?

It is a term some use for vetting inspection scheduling, but we could not find it as a named OCIMF system. Requests go through the SIRE inspection request process.

Can I choose my SIRE inspector?

No. You set which Submitting Companies receive the request and in what order; the accepting company assigns an inspector.

How long does an inspection request stay open?

Two weeks, or until a Submitting Company accepts. If all decline, you are notified and can raise a new request.

How many SIRE 2.0 inspectors are there?

OCIMF reported 460 accredited SIRE 2.0 inspectors after the first year, covering more than 22,000 inspections.

Can Marine Inspection track inspection requests?

Yes. Book a demo to see request, readiness and observation tracking per ship.

Ready for whichever inspector comes

A well-timed request, accurate data and a prepared crew make any accredited inspector’s report a fair one.