A scrubber is only an equivalent to compliant fuel while its washwater record proves it. In more and more waters it also has to prove the system was not discharging at all. This guide covers what the monitoring system must record, how to read the data each day, how to log calibrations, and how to show PSC the mode switches made before restricted zones. Book a demo to keep scrubber records in one place.

EGCS washwater · for chief engineers

Scrubber compliance: a washwater monitoring record that holds up in any port

Four numbers decide whether washwater may go overboard. Your record has to show all four, every 90 seconds, with the ship’s position.

6.5
pHMinimum at discharge
50
PAHµg/L phe above inlet at 45 t/MWh
25
TurbidityFNU above inlet
4.3
SO2/CO2Ratio for 0.10% equivalence

What the washwater monitoring system must record

Under the 2021 EGCS Guidelines (MEPC.340(77)), washwater data is recorded at least every 90 seconds and kept for at least 18 months. For maintenance, sea connections and malfunction rules, see our scrubber maintenance and compliance guide; this page focuses on the record. Try the platform free.

pHAt the discharge point; inlet too for reference
PAHOutlet against inlet, as phenanthrene equivalent
TurbidityOutlet against inlet, in FNU
FlowWashwater flow, needed to apply the PAH limit
SO2/CO2Exhaust ratio after the scrubber
ModeOpen, closed or bypass, with time of each change
PositionGPS with every record, to prove where discharge happened
LoadEngine load and fuel sulphur in use

Daily scrubber pH and washwater data review

A daily look at the trend catches problems before they become non-compliance. The chart shows an illustrative 24 hours of outlet pH with what each pattern usually means.

pH 6.5
00:0006:0012:0018:0024:00
Slow drift downRising load or lower alkalinity water; check flow before the limit
Dip toward 6.5Example at 08:00–10:00: manoeuvring or low flow; note the cause in the log
Flat lineA frozen sensor, not perfect operation; check the probe
Sudden jumpAir in the sample line or fouling; clean and recheck

Illustrative data. Limits allow some differences during manoeuvring and transit; follow your approved manuals.

Scrubber sensor calibration log: what each entry needs

A monitoring record is only as good as the sensors behind it. Inspectors ask for calibration history, not just the current reading. See a calibration log in the demo.

Calibration entry, example

Date and time11-OCT-2026, 0930
SensorOutlet pH probe, serial 4471
Reference usedBuffer pH 4.01 and 7.00, lot 2291
As found6.82 vs 7.00
As left7.00 vs 7.00
BySecond engineer, signed

Why each field matters

1“As found” shows how far the sensor had drifted, and how long data may have been off
2Reference lot numbers prove the standard itself was in date
3Serial numbers link the entry to the exact probe, even after a swap
4A signature shows who did it and that it followed the approved manual

Keep washwater evidence together

Calibrations, mode switches, residue landings and daily checks on one record per ship, ready for any inspection.

Open-loop scrubber bans: plan the mode switch before the zone

Restrictions on washwater discharge keep spreading. ICS keeps a list of ports and sea areas that prohibit open-loop discharge, with more than 80 entries across over 40 jurisdictions. Treat each restricted zone like an ECA boundary: plan the switch, and log the time and position.

Since 1 Jul 2025Denmark, Sweden, FinlandOpen-loop discharge banned in territorial waters; all scrubber discharge banned from 1 January 2029
From 1 Jul 2027OSPAR coastal watersOpen-loop discharge banned in inland waters and port areas of the north-east Atlantic
From 1 Jul 2029OSPAR, all dischargeClosed-loop discharge also banned in those areas; parties may delay by up to three years
VariesIndividual portsMany ports in Europe, Asia and the Americas restrict open-loop use; check before every call

Mode switch log, example entry

ZoneDanish territorial waters
SwitchedOpen loop → compliant fuel
Time (UTC)12-OCT-2026, 0215
Position57°48.6′N 010°12.3′E
SignedChief engineer

If the switch is to compliant fuel, the fuel changeover record applies too. Our ECA fuel switching guide covers changeover timing.

Scrubber sludge and residue records

Residues from washwater treatment must be landed to reception facilities, not discharged at sea or burned on board. Closed-loop and hybrid systems produce more of it, and inspectors check that what was produced matches what was landed.

ProducedSludge tank soundings recorded regularly
StoredTank level and capacity known before each port
LandedQuantity, port and receipt recorded and kept

Scrubber records PSC checks in open-loop ban areas

In a restricted area the inspector’s question changes from “were the limits met?” to “was anything discharged here at all?”. Have these ready. Our MARPOL record book checklist covers the related books.

1Approval documentsEGCS certificate, technical manual and on-board monitoring manual
2Mode historyTime and position of every switch, matched to the zone
3Monitoring dataWashwater and exhaust data with GPS, last 18 months
4Calibration logRecent entries for every sensor in use
5Residue landingsReceipts matching sludge produced
6Fuel recordsChangeover log and BDNs if switched to compliant fuel

Washwater monitoring checklist for chief engineers

Run through this daily and before every restricted zone.

How Marine Inspection keeps scrubber records inspection-ready

Marine Inspection brings the paper side of scrubber compliance together: daily checks, calibration entries, mode-switch logs and residue receipts, all per ship and visible to the superintendent. The timeline below is an illustrative passage into a restricted area.

Passage log · MV example · SkagerrakNo open-loop discharge in zone
22:00Daily washwater check done
02:15Switch logged with position
06:40Port call, no discharge
11:30Sludge landed, receipt photo
15:50Exit, open loop resumed
Daily checksSame scrubber checklist on every ship
Calibration logEntries with photos of readings
Mode switchesTime and position on each change
ReceiptsResidue landings kept with the record

Scrubber washwater monitoring FAQs

What washwater parameters must a scrubber monitor?

pH, PAH and turbidity, with washwater flow and position, under the 2021 EGCS Guidelines. The exhaust SO2/CO2 ratio is also monitored to show equivalence.

How often must washwater data be recorded?

At least every 90 seconds under the 2021 Guidelines, with the data kept for at least 18 months.

What is the scrubber pH limit?

A minimum of pH 6.5 at the discharge, with allowances during manoeuvring and transit set out in the guidelines.

Where are open-loop scrubbers banned?

In Danish, Swedish and Finnish territorial waters since 1 July 2025, OSPAR inland waters and port areas from 1 July 2027, and many individual ports. Check current lists before each voyage.

What happens to scrubber sludge?

It must be landed to a reception facility, not discharged at sea or burned on board, with the landing and receipt recorded.

Can Marine Inspection hold our scrubber records?

Yes. Book a demo to see daily checks, calibration logs and mode switches kept per ship.

Prove every litre, or prove there were none

Clean monitoring data, logged calibrations and recorded mode switches keep the scrubber an equivalent in every port.