When someone goes over the side, the Master has seconds to get the ship turning and minutes to get it back. Three named turns exist for this, the Williamson, the Anderson and the Scharnow, and every bridge team has a favourite. What do the published tests actually show? Two simulator studies and the standard references give a clearer picture than the folklore does, and they also show where the evidence stops. This guide, written for the Master, compares the turns, sets out what each study tested and did not test, and shows how to turn it into a drill that uses your own ship's data. For the recovery equipment, see our SOLAS life-saving appliances Chapter III requirements and inspection guide.

Man Overboard Turns Compared: Williamson, Anderson and Scharnow
What the simulator studies and IAMSAR descriptions show, where they are silent and how a Master can turn it into a ship-specific drill.

Free trial available. Or book a walkthrough built around your own man overboard drills.
Read this first. This guide supports training and passage planning. In a real man overboard, the ship's procedures, the IAMSAR Manual, the Master's judgement and the actual handling characteristics of the ship decide. Research results below come from simulators in calm conditions, and the page says so wherever it matters.
2% to 34%
Anderson faster, by time
In a 2020 simulation of seven ship models, the Anderson turn was faster in every trial (Kim, Chae and Lee).
~5 min
Time saved on a bulk carrier
The Anderson turn saved up to about 5 minutes against the mean in a 2015 simulator study of a 215 m bulk carrier.
250 / 60 / 240
Heading-change triggers
Anderson at 250 degrees, Williamson first reversal at 60 degrees, Scharnow at 240 degrees, as the IAMSAR descriptions are summarised.
Calm only
What the studies tested
Both simulations used calm conditions. Neither tested a heavy sea, poor visibility or crew size.

The Three Turns: What Each One Does and Which Situation It Is For

The rudder orders for each turn as the standard references describe them

The IAMSAR descriptions, as summarised in the TransNav paper and an Officer of the Watch article, give each turn as a sequence of rudder orders tied to heading changes. The Anderson turn puts the rudder toward the person's side until the heading has changed by 250 degrees, then midships, followed by a stopping manoeuvre. The Williamson turn reverses the rudder after 60 degrees and returns to midships 20 degrees short of the reciprocal course. The Scharnow turn holds rudder for 240 degrees, then reverses and returns to midships 20 degrees from the reciprocal. The diagram shows them side by side.

How Far the Heading Changes Before Each Rudder Order: The Three Turns Side by Side (Our Diagram of the Published Descriptions)
Anderson

Rudder toward the person until 250 degrees, then midships and stop
Williamson


Rudder toward the person for 60 degrees, then opposite rudder, midships 20 degrees short of the reciprocal
Scharnow


Rudder over for 240 degrees, then opposite rudder, midships 20 degrees from the reciprocal. Not for immediate action
Bar length shows the first-phase heading change on a 0 to 360 degree scale (not to scale for the reversal phase). Descriptions as summarised in the TransNav 2015 paper and an Officer of the Watch article citing IAMSAR Volume III. Rudder angles are not given in the sources. Check the current IAMSAR Manual and your ship's own procedure.

Why Scharnow is not for an immediate fall and what that leaves for the Master

The practitioner article states that the Scharnow technique is not suitable where the individual has just fallen overboard, while Williamson and Anderson are suitable for immediate action. That leaves Master and watch with two choices for the common case, which is what the simulation studies compare. Scharnow, and the Loren turn described in IAMSAR, were not simulated in the study that tested seven ship models.

What Two Simulator Studies Found: Anderson Was Faster in Both

The 2020 study across seven ships, from a small chemical tanker to a cruise ship

Kim, Chae and Lee ran the Williamson and Anderson turns in a full mission simulator on seven ship models, from a 1,116 GT chemical tanker to a 150,000 GT cruise ship, in calm wind, waves and current. The Anderson turn was faster on every ship. The gap was small on the smallest tanker and the cruise ship and widest on the bulk carriers and the 2,700 TEU container ship. The authors suggest the Anderson turn be recommended to all ships seeking a rapid approach, not only those with tight turning characteristics.

Time to Complete the Turn by Ship Type: Williamson (Blue) Against Anderson (Amber), Calm Simulation (Kim, Chae and Lee, 2020)
Chemical tanker, 1,116 GT


Williamson 4:25, Anderson 4:20
Chemical tanker, 8,930 GT


Williamson 8:10, Anderson 6:30
Container ship, 2,700 TEU


Williamson 7:40, Anderson 6:00
Handysize bulk carrier, 11,264 GT


Williamson 11:05, Anderson 8:15
Capesize bulk carrier, 108,083 GT


Williamson 18:30, Anderson 14:30
Cruise ship, 150,000 GT


Williamson 7:15, Anderson 6:55
Minutes and seconds from the paper, simulator only with calm wind, waves and current, 35 degree rudder and steering orders followed literally. The 8,000 GT training ship is left out because the paper reports its times inconsistently and its Williamson turn did not reach the original track line. Bars are drawn to the time scale on the Capesize row.
Record Your Own Ship's Track, Time and Drill Results
Keep man overboard drill times, bridge roles, lifebuoy checks and corrective actions for every vessel, with owners and dates.
Free trial available. Or book a walkthrough built around your own man overboard drills.

The 2015 study on a loaded 215 m bulk carrier and what it adds about distance and practice

Formela, Gil and Sniegocki's study at Gdynia Maritime University used 34 students with seagoing training on a bridge simulator with a fully loaded 215 m bulk carrier. The Anderson turn left the ship closer to the person, about 263 to 344 m against about 540 to 610 m for Williamson, and its times were stable across attempts. Williamson times fell with practice. The authors judged the Anderson turn the most effective approach for immediate rescue. They noted that manoeuvre duration mattered more than distance in good conditions, because a rescue boat can cover the gap faster than the ship can.

A Second Study, a 215 m Bulk Carrier: Distance to the Person and Time (TransNav 2015, Average of Three Attempts Each)
DISTANCE TO THE PERSON WHEN STOPPED
Andersonabout 263 to 344 m
Williamsonabout 540 to 610 m
MANOEUVRE TIME
Andersonabout 10.8 to 11.4 min
Williamsonabout 14.7 to 18.1 min, improving with practice
Simulator study with 34 students with seagoing training but no officer experience, a fully loaded 215 m bulk carrier, sea state 1, wind 5 knots and 10 Mm visibility. The paper's efficiency indicator, which includes rescue boat time, favoured Anderson. It did not test adverse weather and did not include the Scharnow turn.

What the studies did not test and why that matters for the Master

Both studies were simulations in calm conditions. The 2015 paper used sea state 1 and 10 Mm visibility with experienced-but-not-officer students, and said adverse weather that might need shielding the person from waves was not tested. The 2020 paper found no correlation between Williamson turn returning ability and ship dimensions, speed or turning measures, and said its Williamson instructions need modification. Neither paper tested the Scharnow turn, heavy weather, poor visibility or different crew sizes.

Choosing the Turn by Condition: A Table of What the Sources Say and Where They Stop

Sea state, visibility, ship type, crew and a delayed discovery

The table below answers the question the meta description poses: which turn when. The honest answer is that the sources support a clear preference for the Anderson turn in calm conditions for an immediate fall, say little about rough seas or poor visibility, and do not address crew size at all. We have marked each gap so the Master knows what needs ship-specific testing.

Which turn when: what the sources say and what they do not (our synthesis)
ConditionWhat the sources sayGap to be aware of
Person has just gone over the sideIAMSAR as summarised: Williamson and Anderson are suitable for immediate action. Scharnow is not suitable for an immediate actionNone for immediate action
Fastest return in calm weatherAnderson was faster in every trial in both simulationsCalm conditions only. The Kim paper found no reliable formula for Williamson
Reduced visibilityA practitioner article lists Williamson as working well in reduced visibility because it makes good the original trackNo simulation tested visibility below 10 Mm
Ship with tight turning characteristicsPractitioner article: Anderson suits ships with tight turning characteristics. Kim et al. say Anderson was fastest regardless of engine power or rudder efficiencySeven ship models only, with no full-scale sea trials
Heavy sea or swellThe IMO guide says to approach with the weather fine on the bow and consider stopping to create a leeNo study we read compared the turns in heavy sea
Large or small bridge teamNone of the sources we read compares turns by crew sizeThis is a gap. Do not rely on any claim about crew size without testing it on your ship
Person not seen to fall, or delayed discoveryScharnow is described as the turn to use when the situation is not immediateThe Kim paper did not test Scharnow, and TransNav did not mention it
Sources: Kim, Chae and Lee (JMSE, 2020), Formela, Gil and Sniegocki (TransNav, 2015), an Officer of the Watch practitioner article and IMO MSC.1/Circ.1182/Rev.1. The synthesis is ours.

The First Minute: Immediate Actions That Matter Whichever Turn You Use

The helm, the marker, the lookout and the approach

An Officer of the Watch article by a serving third officer lists the immediate actions: put the helm hard over toward the side the person fell, release a lifebuoy and smoke signal, sound the alarm, assign a lookout, mark the position on the electronic chart, appoint a helmsman and tell the Master and engine room. IMO's recovery guide adds advice on the approach, with the weather fine on the bow and a lee created by stopping. The article is a practitioner's educational piece, not a regulation, and your ship's own procedure takes precedence. For how recovery equipment is inspected, see our life-saving appliance inspection software.

The First Minute: Immediate Actions Before and During the Turn (Practitioner Article and IMO Guide, Our Grouping)
1
Helm over toward the person's side
The practitioner article says to put the helm hard over toward the side the person fell, to clear the stern.
2
Lifebuoy and smoke signal
Release them on the reported side to mark the position.
3
Alarm and lookout
Sound the alarm and assign a lookout who keeps the person in sight and points.
4
Mark the position
Place a MOB mark on the electronic chart or GPS and start the log with time and position.
5
Helmsman, engines, Master
Appoint a helmsman, switch to hand steering, alert the engine room and inform the Master.
6
Approach with weather on the bow
The IMO guide says to approach with the wind, sea or swell fine on the weather bow, and notes that stopping to create a lee helps.
Items 1 to 5 are from the Officer of the Watch article by a serving third officer, citing MGN 71(M) and IAMSAR Volume III. It is a practitioner's educational article, not a regulation. Item 6 is from IMO MSC.1/Circ.1182/Rev.1 section 7.5. Follow your ship's own procedure, which takes precedence.

Turning the Evidence Into a Drill That Uses Your Own Ship's Data

Why the ship's own track beats any general rule

Kim and colleagues recommend that actual track results be posted on the wheelhouse poster and that IMO give clearer guidance on man overboard sea trials. The TransNav study found that repeated practice improved performance. Together they point to the Master's most useful step: run the chosen turn in drills at normal loading conditions, record the track and time, and post the result. A table of your own ship's numbers is worth more than any comparison table, including ours.

A drill sequence that varies the scenario

A strong drill varies the situation: an immediate fall in daylight, a delayed discovery at night, a different watch officer at the helm and a bridge team with someone missing. Time the turn, the lifebuoy, the lookout call, the position mark and the rescue boat launch, then debrief with corrective actions that have owners and dates.

The Man Overboard Readiness Checklist for the Master

A checklist with a checkpoint type on each item for drills and inspections

Use the table before each drill and before inspections. It covers the ship's own track data, the poster, the bridge roles, position marking, lifebuoys, recovery arrangements, drill variety and the debrief.

Man overboard readiness checklist for the Master, with a checkpoint type on every item (our suggested template)
ItemWhat to checkCheckpoint type
Ship's own turn dataActual track and time for the turn you prefer, from sea trials or drills, kept on the bridgeRecord
Wheelhouse posterManoeuvring information posted and matching the ship's current conditionVisual
Bridge team rolesEach person knows their first task: helm, lookout, mark, alarm, MasterRecord
Position markingMOB function on the electronic chart tested and known to the watchTest
Lifebuoy and smoke signalsPresent, accessible and in date at the bridge wingsVisual
Recovery planRecovery arrangements and rescue boat drills recorded and currentRecord
Drill varietyDrills cover immediate, delayed and night scenarios, and different watch officersRecord
DebriefEach drill ends with a timed debrief and corrective actions with ownersRecord
Our suggested template. Checkpoint types: Visual, Test and Record.

Mistakes That Cost Time When Someone Is in the Water

Six habits that the studies and references warn against

1
Assuming one turn is best for every ship
Simulation results varied by ship, from 2% to 34%. Your ship's own tracks matter more than a general rule.
2
Using Scharnow for an immediate fall
The IAMSAR description as summarised says Scharnow is not suitable when the person has just fallen overboard.
3
Never recording the ship's own track
Kim et al. recommend posting actual track results on the wheelhouse poster. Without them, the Master is guessing.
4
Doing the drill only in calm weather
Both studies were calm. A real event may not be, so rehearse stopping to make a lee and approach with weather on the bow.
5
Not rehearsing the helm order
The practitioner article stresses an immediate hard-over toward the person's side. A delay at the helm costs distance.
6
Ignoring practice effects
The TransNav study found repeated practice improved Williamson turn times. Drill the turn, not just the alarm.

Systems That Keep Man Overboard Drills, Data and Corrections Together

How a dated photo repository, task ownership and deadlines support man overboard readiness

A man overboard plan is only as good as the last drill. Marine Inspection supports a dated photo repository, observations turned into tasks with owners, deadlines and evidence, and certificate and equipment tracking. A dated photo of the wheelhouse poster with your ship's track, a task for each drill finding with a named owner, and tracked lifebuoy and smoke signal checks give a Master evidence that the plan is current. It does not replace the ship's procedures or the Master's judgement.

Frequently Asked Questions About Man Overboard Turns

Which turn is fastest?

In both simulations we read, the Anderson turn was fastest. A 2020 study of seven ship models found it faster in every trial, by about 2% to 34%. A 2015 study of a 215 m bulk carrier found it also left the ship closer to the person. Both were calm-condition simulators, so check your own ship.

When is the Scharnow turn used?

An Officer of the Watch article summarising IAMSAR says Scharnow is not suitable for an immediate action where someone has just fallen overboard. It is described as a manoeuvre for other situations.

Does the Williamson turn have any advantage?

The practitioner article says it makes good the original track and works well in reduced visibility. The 2020 study says its instructions need modification and found no reliable formula for them.

Do the studies cover rough seas or poor visibility?

No. The 2015 study used sea state 1 and 10 Mm visibility. The 2020 study used calm wind, waves and current. Neither tested heavy weather or reduced visibility.

Does crew size change which turn to use?

We found no source comparing the turns by crew size, so we make no claim. Test your preferred turn with your own bridge team in drills.

What does IMO say about approaching a person in the water?

MSC.1/Circ.1182/Rev.1 section 7.5 says to approach with the significant element fine on the weather bow, and that circling or stopping to create a lee can calm the sea. It does not describe the Williamson, Anderson or Scharnow turns.

What should the Master record before a man overboard happens?

The ship's actual track and time for the chosen turn from drills or trials, and a wheelhouse poster with the results. Kim and colleagues recommend posting actual track results and clearer IMO guidance on man overboard sea trials.
Turn the Fastest Safe Recovery Into a Drill Your Bridge Team Owns
Man overboard drills, track records, bridge roles and corrective actions for every vessel, in one system your Masters and superintendents can use.
Free trial available. Or book a walkthrough built around your own man overboard drills.