A good SEEMP Part III is not a binder that sits on the bridge. It is a three-year promise that the ship's attained CII will stay at or below the required value, written so that a verifier can check it and a crew can follow it. The reduction factor tightens each year, so a plan that was comfortable in year one can look thin by year three. This guide covers what the plan contains, when a corrective action plan is triggered, how verification works and how to keep the audit trail in one place. For tracking attained CII between reports, see our CII carbon intensity tracking software guide.
What SEEMP Part III Is and Where It Sits in the Plan Structure
Why Part III exists and how it links to Part I and Part II
IACS Recommendation 175 describes Part III as an implementation plan on how the attained annual operational CII is kept at or below the required CII for three years, and it covers the data needed for the CII calculation. Part II covers the Fuel Oil Data Collection System methodology, and Part I holds the general ship energy efficiency measures. The recommendation says the Part I sections on Measures, Monitoring, Goal and Evaluation should be revised to match Part III, so the three parts do not contradict each other.
Which regulations sit behind the plan and why the format matters
The regulatory basis in the sources we read is MARPOL Annex VI, with the plan format set out in Appendix 2bis of resolution MEPC.346(78), as amended. IACS says the plan must follow that format. A plan that is thoughtful but in the wrong layout can fail at the first check, so start from the official template rather than a blank page. For the related design-side requirement on existing ships, see our {L2}.
Setting CII Targets: Required Values, Rating Bands and the Tightening Curve
How the reduction factor tightens the required CII every year
The required CII falls as the reduction factor rises. We read MEPC.400(83) as setting 11% for 2026 and 21.5% for 2030. The chart shows the selected years we could confirm. Plan for the value of the year you are in and the years ahead, not for last year's figure, and leave a required-CII cell blank where a factor has not been set, as IACS Rec. 175 section 4.1 allows.
How the rating bands are built around the required value
Ratings run from A, a major superior performance, to E, inferior. Rating C is the middle band and is tied to the required annual CII. The Dromon publication says the boundaries are the required CII multiplied by exponential transforms of the d vectors, and gives bulk carrier multipliers of 0.86, 0.94, 1.06 and 1.18. It also says a ship's rating depends on its own attained CII and the fixed boundaries, not on other ships' results. That makes the target setting a matter of your own data, not a race against the fleet.
Building the Three-Year Implementation Plan: Measures, Impact and Responsibility
What each year of the plan should show
The Dromon template includes a table of the targeted annual CII and rating for each of the next three years, and an impact on CII column for every measure. IACS Rec. 175 requires measures that are effective enough to achieve the required CII with reasonable assurance, and a planned self-evaluation. The layout below is our illustration of how to organise those elements. The boxes hold placeholders, not real figures.
Which measures the sources name and how to keep proof that each one was done
The Dromon publication gives only a short list of examples: hull cleaning to reduce drag, speed and routeing optimisation, low-energy lighting, and solar or wind auxiliary power for accommodation services. It gives no numeric impact figures for individual measures. So the effect of each measure must come from your own data and engineering judgement, labelled as an estimate. The table pairs the named examples with evidence you could keep. The evidence column and the last two rows are our suggestions.
| Measure family | Source of the example | Evidence to keep (our suggestion) | Checkpoint type |
|---|---|---|---|
| Hull cleaning to reduce drag | Dromon technical publication | Dated before and after photos, cleaning report and date | Record |
| Speed and routeing optimisation | Dromon technical publication | Voyage plan notes, speed orders and the fuel record | Record |
| Low-energy lighting | Dromon technical publication | Fitting list, dated photos of the installed units | Visual |
| Solar or wind auxiliary power | Dromon technical publication | Installation records and commissioning test | Test |
| Engine and propeller condition | Our suggestion, not from the sources | Condition survey and performance data | Test |
| Operating practice and crew awareness | Our suggestion, not from the sources | Briefing records and standing order sign-off | Record |
Corrective Action Plans: Triggers, Content and the One-Month Deadline
Which ratings trigger the plan and what is said about the sequence
IACS Rec. 175 says a corrective action plan is required if a ship is rated D for three consecutive years or E for one year. The revised Part III with the plan goes to the Administration or an authorised organisation for additional verification. The plan aims to meet the required CII in the second year after the year being rated, and it should be verified in the year between. Check the exact wording against the regulation for your case.
What the plan should contain and what verifiers check
Dromon says the plan should list the actions, their timeline and their expected impact on the CII rating, name the company personnel responsible, and describe possible impediments and contingency measures. IACS adds a root cause analysis and self-evaluation. Additional verification checks that the plan is necessary, follows the Appendix 2bis format, has sensible timelines, is effective, and that the company can carry it out.
Verification, Confirmation of Compliance and the Annual Reporting Clock
How initial, periodical and additional verification differ
Initial verification checks compliance with regulation 26.3.1 and results in a Confirmation of Compliance kept on board. Verification is based on documentary evidence. Periodical and additional verifications have their own document sets in sections 7.2 and 7.3 of the recommendation, and each requires re-issue of the CoC. Once the plan is verified and the CoC re-issued, the Administration or recognised organisation can issue the Statement of Compliance.
What to keep on board so the documents are ready
IACS recommends submitting the latest verified Part II and, if referred to, the latest Part I with the Part III. Keep both with the CoC and the latest CII report, and keep the monitoring records they rely on. The checklist below is our suggested template and should be adapted to your flag and class.
The SEEMP Part III Readiness Checklist: Plan, Data and Evidence
A checklist with a checkpoint type on each item for the superintendent and the compliance manager
Work through the table before each annual report and before the plan is revised. Items marked Record are about documents, Visual about what you can see on board, and Test about a check that proves something works.
| Item | What to check | Checkpoint type |
|---|---|---|
| Required CII for each year | Entered from the current reduction factors, with blanks left where factors are not yet set | Record |
| Part II methodology | Verified SEEMP Part II on board, since initial verification requires it | Record |
| Part I alignment | Part I Measures, Monitoring, Goal and Evaluation sections revised to match Part III | Record |
| Appendix 2bis format | Plan follows the format in MEPC.346(78), as amended | Record |
| Measure effectiveness | Measures are enough to reach the required CII with reasonable assurance | Test |
| Self-evaluation | Review dates set and an owner named | Record |
| Confirmation of Compliance | CoC on board after satisfactory verification | Visual |
| Monitoring data | Fuel, distance and speed records trace back to the data collection system | Test |
Tracking Actions With a SMART Layout So Nothing Slips Between Reports
How to turn the plan's measures into rows someone owns
Both Dromon and IACS call for actions that are specific, measurable, achievable, time bound, and where possible realistic. A table with the fields below turns each measure into a row with an owner, a deadline and a place for evidence. The layout is our illustration, not a prescribed format.
| Field | What goes in it | Why it helps |
|---|---|---|
| Action | One measure, written so one person can own it | Specific |
| Measure of success | The number that will change and how it is read | Measurable |
| Owner | A named company person, not a department | Accountable |
| Deadline | A calendar date inside the three-year period | Time bound |
| Evidence | Photo, record or report attached when closed | Verifiable |
| Expected CII impact | Your estimate, labelled as an estimate | Honest forecast |
Mistakes That Leave a SEEMP Part III Weak at Verification
Six habits that turn a three-year plan into an audit finding
Systems That Keep CII Actions, Evidence and Dates Together
How a dated photo repository, task ownership and deadlines support the audit trail
SEEMP Part III depends on actions being done and proved. Marine Inspection supports a dated photo repository, observations turned into tasks with owners, deadlines and evidence, and certificate and equipment tracking. A dated photo of a cleaned hull, a task for each measure with a named owner, and a tracked Confirmation of Compliance give a verifier an organised record. This does not replace the verified plan or the class or flag process. It keeps the supporting evidence findable.