A bunker barge pumps away, the paperwork is signed, and weeks later the engine room reports sludge, a clogged purifier or a sulphur reading that does not match the note. What can the ship prove then? The answer depends almost entirely on what was recorded and sealed during a few hours alongside. This guide, written for the Technical Superintendent, covers the bunker delivery note, MARPOL sampling, retention periods, how test disputes are decided and what to do with fuel that is not what was ordered. For wider fuel management see our bunker fuel management guide on bunkering operations, quality testing and disputes.

Ship Bunker Delivery Note, Fuel Sampling and Quality Disputes
What the BDN must show, how samples are drawn, sealed and kept, and how a quality dispute is argued and decided.

Build My Bunker Record Process Track Bunker Records Free
Free trial available. Or book a walkthrough built around your own bunker delivery records.
Read this first. This guide is general information built from public P&I club, IMO and industry material. It is not legal advice. Your charter party, bunker contract, flag State, port State and P&I club correspondent decide what you must do in a real dispute, and you should contact them early.
3 years
Keep the BDN on board
Ships required to hold an IAPP certificate keep the bunker delivery note for not less than 3 years after delivery.
12 months
Minimum MARPOL sample custody
The sample stays under ship control until the fuel is substantially consumed and for not less than 12 months from delivery.
5 samples
Typically taken
MARPOL, supplier, vessel, laboratory analysis and surveyor, unless the contract or local rules call for more.
30 days
Typical contract time bar
Britannia P&I notes bunker supply contracts typically carry a 30 day time bar, so claims clocks start early.

Three Records, Three Clocks: What Has to Be Kept, for How Long, and Why It Starts Running at Delivery

The BDN, the MARPOL sample and the contract time bar run on different timers

Regulation 18 puts duties on three things. The BDN must be kept on board for not less than 3 years. The representative sample stays under ship control until the fuel is substantially consumed and for at least 12 months from delivery. Separately, the bunker contract usually carries its own time bar, which Britannia P&I describes as typically 30 days. A ship can therefore be fully compliant with MARPOL retention and still lose a commercial claim because notice went out too late. The chart puts the periods on one scale.

Retention and Claim Clocks on a Bunker Delivery, in Months (Figures from IMO Commentary and Britannia P&I; Bars Drawn to Scale)
BDN kept on board

36 months
MARPOL sample, minimum

12 months
Britannia: consume within

3 months
Typical contract time bar

about 1 month
The 3 year and 12 month periods are the IMO Regulation 18 commentary. The 3 month figure is a Britannia P&I recommendation, not a rule. The 30 day time bar is typical, not universal: read your own bunker contract.

The Delivery in Five Stages: Where Evidence Is Made or Lost

A stage-by-stage view of a bunker operation from the P&I club advice

Britannia P&I says each bunker operation is a unique event and should carry its own risk assessment and plan. Taken together, the club guidance reads as five stages. The first three decide what you can prove, and the last two decide what you can do about it. The diagram groups the advice. The grouping is ours, and the detail below comes from the clubs.

The Five Stages of a Bunker Delivery That Decide Whether You Can Prove Your Case Later (Our Grouping of P&I Club Advice)
1
Before the barge
Read the charter party fuel clause and the specification. Prepare the bunker plan: tanks, filling order, transfer rates, overflow status. Inspect manifolds, hoses and receiving tanks.
2
During delivery
Agree the sampling point and who witnesses it. Watch the continuous drip sampler. Do not sign sample labels until the operation is complete.
3
At the BDN
Check every field. Do not sign if the chief engineer has concerns. Issue a letter of protest when the sample or BDN departs from the agreed arrangements.
4
After delivery
Photograph seals, store samples outside the accommodation, test before use and keep gauging reports and calibration certificates.
5
In a dispute
Notify owners, charterers and the club correspondent. Preserve the referee sample. Inside the time bar, put the claim in writing.
Grouping is ours. Content is drawn from the West of England and Britannia P&I guidance and the Gard article cited at the end.

Before the barge: contract, specification and a bunker plan that names the tanks

The Britannia guidance asks for a bunker plan covering the tanks to be filled, filling order, grade allocations, transfer rates, top-up procedure and overflow tank status. Where possible new bunkers go into empty tanks. Check the fuel clause in the charter party, because the club advice is to apply the latest ISO 8217 version where possible, since older versions may protect the owner less. For the inspection side of fuel quality, see our marine fuel oil quality issues found during inspections.

Keep Every Bunker Delivery's Seals, Photos and Findings in One Dated Record
Link BDN photos, seal numbers, sample locations and laboratory results to the vessel, with owners and deadlines on every follow-up.
Free trial available. Or book a walkthrough built around your own bunker delivery records.

The Bunker Delivery Note: Reading Every Field Before You Sign

What the note must show and what the declaration actually certifies

The required contents, as listed on the Australian Maritime Safety Authority page, run from ship name and IMO number to flashpoint. The supplier's representative must sign a declaration that the fuel conforms to regulation 18.3 and that sulphur does not exceed one of three limits: the regulation 14.1 limit, the regulation 14.4 limit or the purchaser's stated limit. West P&I points out that wrong-sulphur deliveries have gone unnoticed when nobody scrutinised the note, which is why the check belongs to the receiving engineer, not the supplier.

Anatomy of a Bunker Delivery Note: What the Receiving Ship Should Check Before Anyone Signs (Our Illustration of the Listed Contents)
ShipName and IMO number
PortWhere delivery took place
DateDate delivery commenced
SupplierName, address and telephone
ProductProduct name(s)
QuantityMetric tons
Densitykg/m3 at 15 degrees C
SulphurContent in % m/m
FlashpointDegrees C
DeclarationSupplier's representative signs that the fuel conforms to regulation 18.3 and that sulphur does not exceed the applicable limit
Seal numbersOptional under the IMO text, but strongly advised: record the MARPOL sample seal number and every other seal on the BDN
Field list as set out on the Australian Maritime Safety Authority BDN requirements page. The layout is our illustration, not the official form. The official form is in MARPOL Annex VI.

When the note is incomplete: document it and report it

The IMO commentary on Regulation 18 says that if the BDN lacks the required information, or the sample was not properly drawn, labelled or sealed, the ship must document this. The documentation goes to the flag State, copies go to the bunkering port authorities and the supplier, and a further copy stays on board. Britannia and West P&I add that a letter of protest should state the reason clearly, with an entry in the engine logbook.

Sampling and Sealing: Five Samples, Unique Seals and a Place That Is Not the Accommodation

Which sample is which, and who keeps it

West P&I describes typically five samples. The MARPOL sample is not less than 400 ml, sealed by the supplier's representative with a tamper-proof seal bearing a unique number, in the presence of the receiving ship's representative. The table summarises the sample set. The description of the MARPOL sample as a regulatory rather than a commercial referee sample is our reading of the clubs' advice to name the referee sample in the contract.

Who holds which bunker sample and what each is for (West P&I and Gard descriptions)
SampleTypically held byPurpose
MARPOL sampleReceiving ship, sealed in the presence of both partiesRequired by MARPOL. At least 400 ml. Used for regulatory verification, not a commercial referee unless the parties agree
Supplier's sampleBunker supplierThe supplier's own evidence of what was delivered
Vessel's retention sampleReceiving shipKept in case the owner needs it in a dispute
Vessel's laboratory sampleSent to the testing laboratoryTested before the fuel is used
Surveyor's sampleIndependent bunker surveyor, if one attendsA neutral party's evidence

Seals, drip samplers and photographs that hold up later

Britannia advises continuous drip sampling at a designated, mutually agreed and monitored point, with seals that show tampering and cross both cap and body of the bottle. Number seals uniquely and preferably in sequence. Take photographs of the drip sampling point with seals intact before and after, and keep gauging reports, flow meter calibration certificates and surveyor reports. Do not sign sample labels until the operation is complete.

Barge sample or manifold sample: the argument you should settle before the barge arrives

Gard describes the central sampling dispute as barge versus the receiving ship's manifold. Suppliers usually prefer barge samples, owners usually prefer manifold samples because they doubt the barge sample is representative, and Gard has handled cases where barge samples failed fingerprinting. Which point applies depends partly on the ISO 13739 version: Gard explains that the 2010 version places MARPOL sampling at the receiving vessel's inlet manifold, and that the 2020 version also requires representative samples at the manifold absent contrary port State requirements. Gard recommends specifying the ISO 13739 version in the contract. If the barge is not sampling representatively, notify charterers at once and still take and seal your own samples.

How a Quality Dispute Is Argued and Decided

Test variation is part of the argument: the ISO 4259 reproducibility band

ISO 8217 sends disputes over whether a result meets a limit to ISO 4259. The ExxonMobil Marine note, which is vendor material, explains the logic. Two laboratories testing one sample will not agree exactly, so reproducibility defines a band. A single result counts as failing only when it is more than 0.59 times reproducibility beyond the limit. The worked example for viscosity shows how a result slightly above the limit can still be treated as inside it.

How a Disputed Test Result Is Read Against a Limit: ISO 4259 Worked Example (RMG 80 Viscosity, ExxonMobil Marine Vendor Note)
Within limit, 380 or below
Gap
Fails
Limit 380380 + 0.59 x 28.12 = 396.6 cSt
The vendor note says a single result is treated as failing only if it is more than 0.59 times the reproducibility (R) beyond the limit. R is 28.12 in this viscosity example, test method ISO 3104. Zone widths are drawn for illustration. This is vendor material about one parameter. For any real dispute, use ISO 4259 itself and your contract.

Name the referee sample in the contract and keep the chain of custody

Britannia calls designating the referee sample in the contract vital. Gard notes that parties often agree to test a sample jointly and that the result is then binding, and that even without agreement, bunker samples are relevant evidence. Your records of seal numbers, photographs, storage and custody are what make a sample credible. Tell owners, charterers and the club correspondent promptly where there is doubt, suspected malpractice or a quality concern.

Off-Specification and Non-Compliant Fuel: What the Sources Allow and What They Rule Out

Debunkering, retention on board, a non-availability report or a stop on blending

The table sets out the situations. The regulation has two separate ideas. If compliant fuel was genuinely unavailable, Regulation 18.2 asks the owner to show best efforts to obtain it and a Fuel Oil Non-Availability Report goes to the flag State. If the fuel on board is non-compliant, DNV says it may have to be de-bunkered or retained on board as acceptable to the port State, and that blending on board to make it compliant is not allowed. The Gard and club articles we reviewed do not cover debunkering procedure in detail, so contact the flag State and your club before you decide.

What to do with suspected off-specification or non-compliant fuel (as set out by IMO commentary, DNV and P&I clubs)
SituationWhat the sources sayWho to tell
BDN lacks required information, or the sample was not properly drawn, labelled or sealedDocument it. Documentation goes to the flag State, with copies to the bunkering port authorities and the supplier, and a copy stays on boardFlag State, port authority, supplier
Compliant fuel could not be obtainedShow best efforts to obtain it. A Fuel Oil Non-Availability Report is submitted to the flag State, with a copy to the port of destinationFlag State, destination port
Fuel exceeds the sulphur limit and no scrubberCannot be used. DNV says it may have to be de-bunkered or retained on board as acceptable to the port StateFlag State, port State, club
Thinking of blending on board to bring fuel into limitDNV states blending on board to make compliant fuel is not allowed. Any blending must be done by the supplierDo not do it
Barge sample judged not representativeNotify charterers at once. Keep your own sealed samples. Report non-compliance to flag and port State for upload to IMO GISIS (Gard)Charterers, flag, port State
Sources: IMO Regulation 18 commentary, DNV global sulphur cap FAQ, West of England P&I, Britannia P&I and Gard. The table layout is ours.

Bunker Delivery Readiness Checklist for the Technical Superintendent

A checklist with a checkpoint type on each line for vessel audits and desk reviews

Use the checklist when you audit a vessel's bunkering file or before a ship takes fuel in a new port. It is our template, built from the club advice, and not an official form.

Bunker delivery readiness checklist, with a checkpoint type on every item (our suggested template)
ItemWhat to checkCheckpoint type
Contract and specificationCharter party fuel clause, ISO 8217 version and sampling method agreed in writing before the barge arrivesRecord
Bunker planTanks, filling order, rates and overflow status prepared and signed off by the Chief EngineerRecord
Manifold and hosesClean, no visible contamination, connections tightVisual
Sampling pointDrip sampler fitted at the agreed point and sealed, with photos before and afterVisual
Sample setAll samples labelled, sealed with unique numbers, numbers written on the BDNRecord
BDN fieldsEvery listed field present and matching the delivery, including sulphur and declarationRecord
Sample storageOutside the accommodation, cool, ventilated, shaded, logged in the sample registerVisual
Laboratory resultIndependent analysis received and compared with specification before the fuel is usedTest
Letter of protestIssued the same day where a sample or BDN departs from the agreed arrangements, with logbook entryRecord
Our suggested template. Checkpoint types: Visual, Test and Record.

Six Habits That Weaken a Bunker Claim

What the clubs warn against, in the order they tend to occur

1
Signing the BDN under pressure
Britannia advises not signing if the chief engineer has concerns. Issue a letter of protest stating the reason clearly and record it in the engine logbook.
2
Leaving seal numbers off the BDN
Gard notes the IMO text does not require seal numbers, but later IMO guidance advises recording them. Without them you cannot prove which bottle is which.
3
Accepting barge samples without comment
Owners and suppliers often disagree about barge versus manifold sampling. Gard advises telling charterers immediately and taking and sealing your own samples.
4
Storing samples in the accommodation or sun
West P&I says to keep them in a safe, sheltered, ventilated place away from direct sunlight and outside the accommodation.
5
Using new bunkers before the results arrive
West P&I advises not using new bunkers until third-party test results are in order. Do not mix bunkers from different suppliers.
6
Missing the time bar
Britannia notes a typical 30 day contract time bar. A claim that starts late may be lost whatever the fuel analysis says.

Systems That Keep Bunker Evidence Together After the Barge Leaves

How a dated photo repository, task ownership and deadlines support bunker records

A bunker file is evidence, so it has to be complete, dated and findable. Marine Inspection supports a dated photo repository, observations turned into tasks with owners, deadlines and evidence, and certificate and equipment tracking. A dated photo of intact seals, a task for a laboratory result that carries a named owner and a due date, and a tracked sample register give a Technical Superintendent a record that stands up inside the time bar. See also our marine fuel system inspection for contamination, quality testing and tank integrity. The software does not replace the bunker contract, class or flag State, or your club's advice.

Frequently Asked Questions About Bunker Delivery Notes and Fuel Disputes

What must a bunker delivery note contain?

Under the requirements summarised by the Australian Maritime Safety Authority: ship name and IMO number, port, date delivery commenced, supplier name, address and telephone, product name(s), quantity in metric tons, density at 15 degrees C, sulphur content and flashpoint, plus a signed declaration of compliance with regulation 18.3.

How long do I keep the BDN and the MARPOL sample?

Per the IMO Regulation 18 commentary, the BDN is kept on board for not less than 3 years after delivery on ships required to hold an IAPP certificate. The representative sample stays under the ship's control until the fuel is substantially consumed and for not less than 12 months from delivery.

How many bunker samples should be taken?

West P&I describes typically five: MARPOL, supplier, vessel, vessel laboratory and surveyor if attending. Gard advises at least five, with three for the receiving vessel, one for the supplier and one held by an independent party.

Do the seal numbers have to be on the BDN?

Gard says IMO does not require seal numbers on the BDN, but that MEPC.1/Circ.875/Add.1 says seal details should be recorded on it. Recording them is the safer practice.

What is a letter of protest and when do I issue one?

A written objection to the supplier, copied to the port authority, flag State and owner where the sample is missing, unwitnessed or of unknown origin, or the BDN was not issued in line with MARPOL. Britannia also advises one if the chief engineer has concerns.

How is a disputed test result decided?

ISO 8217 refers disputes about whether a result meets a limit to ISO 4259. A vendor note explains that a single result fails only when it is beyond the limit by 0.59 times the reproducibility. Which sample is the referee should be fixed in the contract.

Can I blend off-spec fuel on board to fix it?

DNV states that blending on board to produce compliant fuel is not allowed. Non-compliant fuel may need to be de-bunkered or retained on board, as acceptable to the port State, so talk to the flag State and your club first.
Give Every Bunker Delivery a Record You Can Defend Inside the Time Bar
BDN photos, seal numbers, sample custody, laboratory results and follow-up tasks for every vessel, in one system.
Free trial available. Or book a walkthrough built around your own bunker delivery records.