Choosing a marine fuel used to be a question of price and sulphur content. Now it is a bet on regulation, bunkering ports, engine technology and crew competence at the same time. LNG, methanol, ammonia and biofuels each fit a different part of that bet, and none of them is a clear winner in the sources we read. This guide compares them on adoption, emissions, safety, bunkering and regulatory readiness, with dated figures marked as dated. For how the fuel you burn shows up in your carbon rating, see our CII carbon intensity tracking software guide.

Methanol, Ammonia, LNG and Biofuels: A Practical Fuel Comparison
Adoption, emissions, safety, bunkering and rule readiness for each alternative marine fuel, and what each means for your crew and inspections.
Free trial available. Or book a walkthrough built around your own dual-fuel ships.
9% / 7% / 1%
Orders: methanol, LNG, ammonia
Share of ships ordered in the 12 months to early 2024 (DNV AFI via Seatrade). Dated figures.
Up to 25%
LNG emissions cut claim
Versus conventional marine fuels, with methane slip a caution (ABS op-ed).
25 / 110 / 220 ppm
Ammonia alarm levels
Local alert, global alert and shutdown thresholds in the IMO interim guidelines, as summarised by the Ammonia Energy Association.
Oct 2026
Net-Zero Framework back at IMO
The session adjourned in October 2025 was to reconvene about a year later. We did not confirm the outcome.

Who Is Ordering What: Adoption Figures and Why They Date Quickly

How methanol, LNG and ammonia compared in recent order data

DNV's Alternative Fuels Insight platform, reported by Seatrade Maritime in February 2024, showed methanol with 9% of ships ordered over the previous 12 months, LNG with 7% and ammonia with 1%. About a fifth of ships ordered were to run on alternative fuels. Those numbers are old and order books change every month, so treat them as a snapshot of direction, not a current ranking.

Share of Ships Ordered by Fuel in the 12 Months to Early 2024 (DNV AFI, Dated)
Methanol

9%
LNG

7%
Ammonia

1%
All alternative-fuel ships together

about 20%
Source: Seatrade Maritime, 5 February 2024, citing DNV Alternative Fuels Insight. These are old figures and the order book moves every month. Bars for the three fuels are scaled to 10% full width. The combined bar is the article's statement that a fifth of ships ordered will run on alternative fuels. Check the current DNV AFI platform before quoting.

Where LNG-fuelled ships are working and where they are on order

The same report counted 493 LNG-fuelled ships in operation and 523 on order, excluding LNG carriers. Container ships and car carriers dominated the order book, while crude tankers and ferries were mostly already in service. The chart shows the split by ship type.

LNG-Fuelled Ships by Type: In Operation Versus On Order (DNV AFI, Early 2024, Excluding LNG Carriers)
In operationOn order
Container ships


77 in service / 195 on order
Car carriers


24 in service / 149 on order
Crude tankers


77 in service / 33 on order
Products and chemical tankers


53 in service / 48 on order
Bulk carriers


48 in service / 25 on order
Car and passenger ferries


43 in service / 6 on order
Source: Seatrade Maritime, 5 February 2024, citing DNV AFI: 493 in operation and 523 on order in total. Dated figures, shown to illustrate where LNG fuel has been adopted, not the current fleet.
Track Fuel System Certificates, Tests and Drills in One Place
Keep gas detection tests, bunkering checklists, crew training and class documents for every dual-fuel ship, with dated photos and owners on each action.
Free trial available. Or book a walkthrough built around your own dual-fuel ships.

Fuel by Fuel: Emissions, Safety, Bunkering and Engine Readiness

What the ABS comparison says about LNG, methanol and ammonia on safety and availability

An ABS op-ed in Marine Log in September 2025 compares the three fuels. LNG is called the most mature, with established infrastructure. Methanol has over 120 ports offering it and needs only minor changes to liquid fuel systems, but has high flammability, a low flashpoint and toxicity concerns. Ammonia has near-zero emissions potential, but high toxicity, a narrow flammable range and engines still at an early stage. The author is an ABS manager, so read it as a class society view.

Safety and readiness points for each fuel (only what the sources we read state)
PointLNGMethanolAmmonia
FlammabilityNot detailed in the sources we readHigh flammability and low flashpoint, per the ABS op-edNarrow flammable range of 15 to 28% by volume in air
ToxicityNot discussedA critical safety considerationHigh toxicity, so continuous mechanical ventilation is needed
Emissions pointUp to 25% reduction versus conventional fuels. Methane slip may affect long-term complianceDual-fuel engines run with no fuel slip, avoiding formaldehyde formationNear-zero emissions potential, but unburnt ammonia slip needs SCR
BunkeringNumerous LNG bunker vessels operating worldwideOver 120 ports offering methanolNot quantified in the source
Engine readinessCalled the most technologically mature solutionCalled a promising alternative needing minor changes to liquid fuel systemsEngine development in early stages, about 50 firm orders as of February 2025
Source: ABS op-ed in Marine Log, 3 September 2025. Cells marked as not stated mean the article did not cover them, not that the fuel has no issue. We did not find energy density or flashpoint figures in the sources we read.

Why biofuels are covered only briefly here

The sources we read did not assess biofuels as a group, so we make no comparison claim. The ABS op-ed mentions biomethanol only in a cost projection of about 600 dollars per tonne by 2030. If you are considering drop-in biofuels or bio-LNG, ask your engine maker, class and fuel supplier for approved blends and sustainability documents.

The Rulebook: IGF Code, Interim Guidelines and a Moving Methanol Standard

Which IMO document governs each fuel and how final it is

The IMO Future Fuels page lists the IGF Code for LNG, and interim guidelines for methanol and ethanol, ammonia, ammonia cargo as fuel, hydrogen and LPG. It says technical guidelines are under active development by the CCC sub-committee, so the interim ones may be updated. In September 2026, CCC 12 finalised a revision of the methanol guidelines, with more flexibility on tank placement and new guidance on ventilation and bunkering, subject to MSC approval, according to DNV.

Where each fuel sits in the IMO safety framework (circular titles from the IMO Future Fuels page)
FuelIMO documentCategory shownCheckpoint type
LNGIGF Code, MSC.391(95), as amendedRegulations / ResolutionRecord
Methanol / ethanolMSC.1/Circ.1621, interim guidelines (revision finalised at CCC 12, pending MSC approval)Interim guidelinesRecord
AmmoniaMSC.1/Circ.1687, interim guidelinesInterim guidelinesRecord
Ammonia cargo as fuelMSC.1/Circ.1702, interim guidelinesInterim guidelinesRecord
HydrogenMSC.1/Circ.1701, interim guidelinesInterim guidelinesRecord
LPGMSC.1/Circ.1666, interim guidelinesInterim guidelinesRecord
Sources: IMO Future Fuels safety guidelines page and DNV on CCC 12. The page lists titles, not requirements. Read the circulars themselves.

What the ammonia guidelines say about toxic exposure and gas alarms

The Ammonia Energy Association summarises MSC.1/Circ.1687 as requiring fuel containment that minimises release sources, with released ammonia directed to recovery, treatment or safe open-air locations, plus toxic area classification and alarms. Its article gives thresholds of 25, 110 and 220 ppm. The guidelines were approved at MSC 109 in December 2024. We have not reviewed the circular itself.

Ammonia Gas Alarm Ladder in the IMO Interim Guidelines (As Summarised, Not the Circular Itself)
25 ppm
Local alert
Alarm for the affected area.
110 ppm
Global alert
Alarm across the ship.
220 ppm
System shutdown
Automatic shutdown of the system.
Thresholds from the Ammonia Energy Association article on MSC.1/Circ.1687, published January 2025. Read the circular and your class rules for the full requirements, including exposure limits and PPE.

Regulation Pressure: The Net-Zero Framework and What Is Still Unknown

What the framework would do and why adoption was adjourned

The Net-Zero Framework would apply to ships above 5,000 GT, which Vinson and Elkins says emit about 85% of shipping CO2. They would meet annual GHG fuel intensity targets, with credits and a fund. In October 2025 the extraordinary session adjourned adoption for a year after a narrow vote, with critics citing limited clean fuel supply. The session was due to reconvene around October 2026. We could not confirm the result, so check the IMO before relying on any date.

The Net-Zero Framework Timeline: Approved, Adjourned, Due Back
APRIL 2025
Approved at MEPC 83
Annual GHG fuel intensity targets for ships above 5,000 GT, with credits and a fund.
14 TO 17 OCT 2025
Adoption adjourned
A motion to adjourn for one year passed. Concerns included clean fuel supply.
OCTOBER 2026
Session due to reconvene
Outcome not confirmed by us. Check IMO.
REPORTING YEAR 2028
Earliest possible entry
If adopted in October 2026, per Vinson and Elkins, who call the timeline uncertain.
Sources: Vinson and Elkins and IMO press briefing. We did not find the October 2026 result. Do not plan around it without checking.

Why fuel choice should be tested against more than one rule outcome

If the framework is adopted, Vinson and Elkins says it could still enter into force for reporting year 2028, though it calls the timeline uncertain. If it is not, other drivers remain, such as the CII rating covered in our {L2}. A fuel decision that only works under one regulatory outcome is a fragile one.

Questions to Answer Before You Choose a Fuel (Our Decision Aid, Not a Ranking)
Where will it bunker?
Check port availability on your trade pattern. The sources report wide LNG availability and over 120 methanol ports, and do not quantify ammonia.
What do the rules allow?
LNG sits under the IGF Code. Methanol, ammonia, hydrogen and LPG sit under interim guidelines that are still developing.
Who is trained?
Ammonia toxicity and methanol flammability need crew competence, drills and records.
What is the real emissions result?
Ask for well-to-wake figures from the fuel supplier, and for methane or ammonia slip data from the engine maker.
Which rule drives your cost?
The Net-Zero Framework is unsettled, so test your plan against more than one outcome.
Our suggested questions. The sources do not rank the fuels, and neither do we.

The Alternative Fuel Operational Readiness Checklist for Ships

A checklist with a checkpoint type on each item for the superintendent and the safety officer

Whichever fuel you choose, the operational evidence looks similar: rules identified, certificates in date, detection and alarms tested, a bunkering procedure, trained people and fuel records. Use the table as a base and adapt it to the fuel, the maker's manual and your class rules.

Alternative fuel operational readiness checklist, with a checkpoint type on every item (our suggested template)
ItemWhat to checkCheckpoint type
Applicable rulesIGF Code or the relevant interim guideline, plus class and flag requirements, identified and filedRecord
Fuel system certificatesClass and statutory documents for the fuel system on board and in dateRecord
Gas or vapour detectionDetectors tested on the schedule set by the maker and the safety planTest
Ventilation and alarmsVentilation running and alarms tested, including toxic gas alarms for ammoniaTest
Bunkering procedureWritten and agreed with the supplier, with the checklist completed each timeRecord
Protective equipmentPPE available, inspected and crew trained to use itVisual
Crew training and drillsCompetence and drill records kept for each fuelRecord
Fuel recordsFuel quantities and sustainability documents filed for compliance reportingRecord
Our suggested template. Checkpoint types: Visual, Test and Record.

Mistakes That Make a Fuel Transition Harder Than It Needs to Be

Six habits that leave a dual-fuel ship exposed

1
Choosing a fuel on one number
Emissions, bunkering, safety, engine readiness and rules all matter. The sources compare fuels across several dimensions for this reason.
2
Quoting old order figures
Order books change monthly. The 2024 shares we show are dated and illustrate only.
3
Ignoring slip
The ABS op-ed notes methane slip may affect LNG long-term compliance, and unburnt ammonia needs SCR.
4
Assuming the rules are settled
Methanol guidelines were revised at CCC 12, subject to MSC approval, and the Net-Zero Framework remains open.
5
Under-training the crew
Toxicity, low flashpoint and cryogenic hazards differ by fuel. Generic training will not cover them.
6
No evidence trail for bunkering
Bunkering procedures, checks and samples should be recorded each time.

Systems That Keep Fuel Safety Evidence, Tests and Training Together

How a dated photo repository, task ownership and deadlines support a new fuel on board

A new fuel adds new equipment, new hazards and new records. Marine Inspection supports a dated photo repository, observations turned into tasks with owners, deadlines and evidence, and certificate and equipment tracking. A dated photo of a gas detector test, a task for each overdue drill and a tracked fuel system certificate give a superintendent one place to see what is done and what is open. This does not replace the class and flag requirements. It keeps the evidence organised.

Frequently Asked Questions About Ship Alternative Fuels

Which alternative marine fuel is the most popular for new ships?

In the DNV AFI figures reported in February 2024, methanol led with 9% of ships ordered over 12 months, ahead of LNG at 7% and ammonia at 1%. Those figures are dated, so check the current DNV AFI data.

Is LNG the most mature alternative fuel?

The ABS op-ed calls it the most technologically mature solution, with numerous LNG bunker vessels operating worldwide. It also notes that methane slip may affect long-term compliance.

What are the main safety issues with methanol?

The ABS op-ed cites high flammability, a low flashpoint and toxicity as safety considerations. IMO guidelines for methanol and ethanol are in MSC.1/Circ.1621, and CCC 12 finalised a revision, which is subject to MSC approval.

What are the main safety issues with ammonia?

High toxicity and a narrow flammable range of 15 to 28% by volume in air, according to the ABS op-ed. The IMO interim guidelines are MSC.1/Circ.1687, and the AEA summary lists alarm levels of 25, 110 and 220 ppm.

Is there an IMO code for each fuel?

LNG has the IGF Code. Methanol, ammonia, hydrogen and LPG have interim guidelines according to the IMO Future Fuels page, which says the guidelines are still being developed.

What is the IMO Net-Zero Framework?

A framework approved at MEPC 83 in April 2025 with annual GHG fuel intensity targets for ships above 5,000 GT, credits and a fund. Adoption was adjourned for a year in October 2025. We did not confirm the October 2026 outcome.

Do biofuels need new engines?

The sources we read did not assess biofuels as a group, so we make no claim here. Ask your engine maker and class about approved blends for your engine.
Be Ready for the Fuel on Board, Not Just the Fuel on Order