Most fleets already run a computerised planned maintenance system. Far fewer have it approved by class, and that gap costs money. A class-approved PMS lets the chief engineer credit machinery items from maintenance records instead of opening them up for a surveyor. Condition monitoring goes further, and can credit machinery without opening it at all. This guide is for technical superintendents who want to turn their PMS into survey savings. It covers continuous survey versus approved PMS, what can be credited, the approval process, condition monitoring notations and how documented data extends survey intervals. Book a demo to see how Marine Inspection keeps PMS records ready for class.

Planned maintenance system · for technical superintendents

PMS class approval and survey credit: climb the ladder from opening up to proving condition

Engine surveyOpen everything for the surveyor
Continuous surveyItems in rotation over 5 years
Approved PMSChief engineer credits from records
Condition monitoringCredit without opening up
~85%of LR-classed ships on continuous survey
~15%with an approved machinery PMS

PMS class approval: from continuous survey to approved PMS

Lloyd’s Register describes machinery survey as a progression. About 85% of its ships use continuous survey, while only about 15% have an approved machinery PMS, even though nearly all operators use computerised PMS software. LR calls the approved PMS the turning point.

Continuous survey (CSM)
CycleEvery item within 5 years, about one-fifth a year
BasisOpening up and examination
Chief engineerMay survey listed items; surveyor confirms
DowntimeRegular, to open machinery
Approved PMS
CycleEach item on its own PMS interval
BasisMaintenance records and readings
Chief engineerCredits applicable items from PMS work
DowntimeSurvey work matches planned maintenance
Condition monitoring (CM)
CycleBased on trend data against a baseline
BasisMonitored condition
Chief engineerCredits items without opening them
DowntimeLowest: open only when data says so

For what the PMS itself must contain before class looks at it, see our planned maintenance system guide.

Machinery survey credit: what the chief engineer can and cannot credit

Under continuous survey, class lets the chief engineer examine some items and keeps others for its own surveyors. Indian Register of Shipping’s guidelines show a typical split. Every society keeps its own list, and every item still needs approval.

Chief engineer may examine

  • Main engine cylinder covers
  • Cylinder liners and pistons
  • Turbochargers
  • Governors
  • Independently driven pumps

Kept for the class surveyor

  • Gearing and couplings
  • Boilers and pressure vessels
  • Propellers and screwshafts
  • Sea connections
  • Steam and gas turbines; main engine controls
Before: written notice to class
During: open up, renew with OEM parts, test
After: records, photos, replaced parts kept, signed declaration
Credit: surveyor confirms at the next port
Not allowed: items known to be damaged or under temporary repair

Most of the chief engineer’s items are main engine running gear. Our main engine overhaul schedule and inspection guide covers the measurements those records need.

PMS class approval process: documents, implementation survey, annual audit

IACS UR Z20 sets the common rules for a planned maintenance scheme for machinery. Each society runs its own procedure on top.

1

Submit

Organisation chart, equipment list, machinery identification procedure, PM sheets, condition monitoring equipment and baseline data, PM schedule.

2

Approval

A Certificate of Approval for the PMS is issued and kept on board. The PMS must run on a computerised system.

3

Implementation survey

Within one year of approval. Checks the PMS matches the documents and the crew know it.

4

Annual audit

Records, breakdowns, out-of-tolerance readings and whether intervals were kept.

What puts approval at risk Intervals exceededPMS not properly carried outOverdue recommendations or unrepaired damage (item removed from the PMS)Change of owner, manager or class (approval reconsidered)
Survey-ready records

Your PMS already holds the evidence. Make it count for class.

Readings, photos, parts and sign-offs on every job, ready to show at the implementation survey and every annual audit.

Condition monitoring notation and survey credit by class society

Each society packages condition monitoring credit differently. The idea is the same: an approved PMS first, then monitoring data good enough to credit machinery without opening it.

SocietySchemeWhat it gives you
ABSPMP, with PM and CM indicatorsEnrolled items credited towards the special periodical survey of machinery. RBM and RCM build on PMP.
LRMachinery PMS, then Machinery Condition MonitoringChief engineer credits items from the PMS; CM credits them without opening.
DNVCondition based maintenance survey arrangementScheduled plus predictive maintenance with an approved service supplier.
DNVTMON (water-lubricated tail shafts)No fixed tail shaft withdrawal interval while monitoring shows no serious deterioration.

Summary from ABS’s MRM Guide, LR’s machinery survey guidance and DNV notices. Check current rules with your society.

Baseline is everything. ABS defines it as the first condition-monitoring data, taken with the item in good order, that later readings are compared against. A new baseline is needed after an overhaul or repair. No baseline, no credit.

Survey interval extension with documented data

Documented data does more than credit a single item. UR Z20 notes that an approved condition monitoring system may allow the continuous machinery survey cycle to be extended. DNV’s TMON notations show how far this can go.

Fixed interval
Withdraw on schedule, whatever the condition
Monitored (TMON)
Measure bearing wear at every shaft stop; withdraw only when data says so

Illustrative comparison of a tail shaft withdrawal schedule. TMON applies to water-lubricated stern tube bearings.

The tail shaft survey itself is covered in our propeller shaft maintenance and inspection guide.

PMS class approval readiness checklist

How Marine Inspection supports class-approved PMS and survey credit

Marine Inspection keeps the records class asks for attached to every job: readings, photos, parts used, sign-offs and condition data against its baseline. Before an audit, it pulls them into one survey pack. The pack below is illustrative.

Annual audit packCredit itemsCM trendsBreakdowns
DoneClass PMS items: 214 of 214 within interval
DoneChief engineer credits: 9 items with photos and declarations
DoneOut-of-tolerance readings: 3, each with action taken
Check1 baseline due after DG2 overhaul
DoneBreakdowns: 2 recorded, repairs verified
98%audit-ready

One pack for the surveyor, built from everyday PMS work.

PMS class approval: frequently asked questions

What is the difference between continuous survey and an approved PMS?

Continuous survey opens up every item within five years, about one-fifth a year. An approved PMS lets items be credited from the maintenance records on their own intervals, with an annual audit.

How long does PMS class approval take?

After the documents are approved, UR Z20 requires the implementation survey within one year. The PMS then replaces continuous survey once that survey is satisfactory.

What can the chief engineer credit?

Typically main engine running gear, turbochargers, governors and independent pumps. Gearing, boilers, propellers, screwshafts and sea connections stay with the surveyor. Lists vary by society.

Can condition monitoring extend survey intervals?

Yes. UR Z20 allows an approved condition monitoring system to extend the cycle, and DNV’s TMON notations remove the fixed tail shaft withdrawal interval for water-lubricated shafts while the data stays good.

Can class approval be withdrawn?

Yes, if the PMS is not properly carried out or intervals are exceeded. A change of owner, manager or class also means the approval is reconsidered.

Turn everyday maintenance into survey credit

Keep every record class needs on the job it belongs to, and walk into every audit with the pack already built.