Every PSC deficiency on Form B carries two codes: what is wrong, and what must happen next. The action code sets the deadline and who checks the fix; the rectification record decides whether the finding actually closes. This guide decodes the action codes, sets the deadline for each, and shows how to document rectification so the next inspector sees it closed. Book a demo to track PSC findings to close-out.
PSC deficiency codes and action taken: read the code, meet the deadline, prove the fix
A Form B line, decoded. The action code is what drives your next 14 days.
Illustrative line. Full deficiency code numbers follow the code list used by each regime.
PSC action taken codes and what each one requires
Action codes are broadly shared across regional MoUs, though each publishes its own list. Code 17 means rectify before departure without detention; code 30, where used, means grounds for detention. The Paris MoU now marks detention with a “grounds for detention” tick box. For how detainable and non-detainable findings differ, see our detainable vs non-detainable guide. Try the platform free.
| Code | Meaning | Deadline | Who confirms the fix |
|---|---|---|---|
| 10 | Deficiency rectified | Already done | Verified by the PSCO at the inspection |
| 15 | Rectify at the next port | Next port of call | Next port may check |
| 16 | Rectify within 14 days | 14 days maximum | Master; next inspection may check |
| 17 | Rectify before departure | Before sailing | Master; PSCO may verify |
| 18 | Rectify non-conformity within 3 months (older code lists) | 3 months | Company and flag or RO |
| 19 | ISM: audit by the Administration before departure | Before sailing | Flag or RO auditor |
| 21 | ISM: company corrective action within 3 months (Paris MoU) | 3 months | Company; ship eligible for re-inspection after |
| 30 | Grounds for detention (Paris MoU uses a tick box) | Before release | PSCO verifies before release |
| 46 | Sail to an agreed repair port to rectify | At the repair port | Repair port authorities |
| 47 / 48 | Class or flag condition accepted in place of full fix | As set in the condition | Class society or flag |
| 81 | Temporary repair; full fix within a set time | As specified, up to 14 days | Master; next inspection may check |
| 99 | Other: instruction written in clear text | As written | As written |
Meanings summarised from Paris MoU guidelines and a published MoU Form B legend. Always read the code list printed with your own inspection report.
Code 17 vs code 30: why one closes on board and one needs the inspector
Both must be fixed before the ship sails. The difference is who has to see it, and what goes on the ship’s record.
Rectify before departure
Ship detained
Deficiency rectification deadlines: build the tracker on day one
Turn every Form B line into a dated task before the inspector leaves. The example below shows one inspection on 12 October with four findings.
Close every PSC finding with proof
Turn each Form B line into a task with a deadline, attach the evidence, and see every open finding across the fleet.
Rectification record: what each closure needs
The next inspector reads the database and may ask how an earlier finding was closed. A good rectification record answers every question without a phone call.
Rectification record, example
Extra evidence by code
Why rectification records get rejected
Most rejected closures fail on evidence, not on the repair itself.
Close the loop in the safety management system
A PSC finding is also a non-conformity under the company’s SMS. Closing it on board is only half the job. Our guide to the top detention codes shows which findings repeat across fleets.
PSC deficiency rectification checklist
Use this from the moment Form B is handed over. If a detention seems unjustified, our guide on challenging a detention covers the appeal route.
How Marine Inspection tracks PSC findings to close-out
Marine Inspection turns a Form B into tracked findings: each line gets its action code, due date and owner, and closes only with evidence attached. The board below is an illustrative inspection.
Open
Evidence attached
Closed
PSC deficiency and action code FAQs
What does PSC action code 17 mean?
Rectify before departure. The deficiency must be fixed before the ship sails, but it is not a detention, and the master confirms the fix unless the PSCO chooses to verify it.
What does PSC action code 30 mean?
Grounds for detention, in regimes that use the code. The ship cannot sail until the PSCO verifies rectification. The Paris MoU records this with a grounds-for-detention tick box.
How long do I have for a code 16 deficiency?
Up to 14 days. The master should fix it as soon as reasonably possible within that period.
What is the difference between code 15 and code 16?
Code 15 requires rectification at the next port; code 16 allows up to 14 days. Both can be checked by a later inspection.
What evidence closes a PSC deficiency?
A dated record linking the finding to the action taken, with photos, test results, the root cause where relevant, and the right signature, such as class or flag for their items.
Can Marine Inspection track PSC deficiencies?
Yes. Book a demo to see Form B findings tracked by code to close-out.
Read the code, meet the date, keep the proof
Findings closed on time with evidence keep a ship’s PSC history clean, and the next inspection shorter.