Engine bearings rarely fail without warning, but the warning is often faint. A temperature reading creeps up a few degrees, a little water gets into the system oil, a deflection reading falls just off the curve, or there is a trace of white metal in the filter. Chief engineers who read these signals together catch white metal damage while it is still a bearing change. Those who miss them end up with a seized crankshaft and a tow. This guide covers the warning signs, the common types of white metal damage, crankshaft deflection and a step-by-step method for bearing failure diagnosis. Book a demo to see bearing records, oil results and deflection readings tracked in one place.

Engine room diagnostics · for chief engineers

Engine bearing failure diagnosis: catch white metal damage before the crankcase does

Journal (crankpin or main journal)Ovality, scoring, hot spots
Oil filmLost film = wiping in seconds
OverlayCorrosion from water in oil
White metal liningFatigue cracks, wiping, scoring
Steel backing shellShell rotation blocks the oil hole

Engine bearing failure: how one bearing ends a voyage

Bearing failure is rarely only a bearing problem. Once the white metal fails, the heat that follows can make oil mist, cause a crankcase explosion and damage the crankshaft. Two recent cases show how fast it happens.

Gard, September 2026

Container ship, North Atlantic

Shell rotatedOil bore closedHot spotOil mist ignited

A gear bearing on the engine turned in its housing and closed its own oil supply. The heat made oil mist in a part of the crankcase with no oil mist detector, and the mist ignited. Alarms came within four seconds. A crew member was badly burned, eighteen engine-room doors were blown off their hinges and the ship was towed to Freeport. Temperature and pressure readings had stayed normal right up to the failure.

Marine Insight case study

Oil/chemical tanker, at sea

Crankpin bearing turnedOil hole blockedCrankshaft seized

A small main engine with no oil mist detector or bearing temperature monitors gave its first sign through a separator alarm, followed by smoke and a hunting engine. All the crankcase relief valves had opened. The crankpin bearing had turned and blocked its oil hole, and the crankshaft seized. The ship drifted for about 10 hours and was then towed to a port of refuge.

Bearing warning signs: temperature, oil mist, wear and oil

Gard’s point is simple: bearing temperature monitoring is essential, but it is not enough on its own. Each signal sees a different stage of the damage, so read them together.

BTM

Bearing temperature monitoring

Sensors on the shell or oil outlet. Usually two high-temperature levels: the first sounds an alarm and the second slows the engine down. Some systems add a deviation alarm against the engine average.

Sees: a bearing that is already running hot
OMD

Oil mist detector

Samples the crankcase for the mist a hot spot gives off. It protects against explosion, but only in the spaces it samples. Gard’s case started in an unsampled area.

Sees: a hot spot hot enough to make oil mist
BWM

Bearing wear monitoring

On large two-strokes, proximity sensors fore and aft measure the crosshead position at bottom dead centre. A shift past the set values points to wear in the crosshead, crankpin or main bearing.

Sees: white metal wearing away
LO

Oil analysis and water in oil

Shore lab results trend wear metals and contamination. Water in oil corrodes the bearing overlay, which is why many engines also have online water-in-oil sensors.

Sees: the conditions that cause damage

Water in system oil: typical guidance

NormalShort spells onlyAct now
00.2 vol%0.5 vol%

Marine Insight quotes a typical maximum of 0.2 vol%, with up to 0.5 vol% for short periods. Use your engine maker’s limits.

White metal damage: reading the bearing surface

When a bearing is opened up, its surface records what happened to it. The shaded band on each shell below marks where that damage usually shows. The appearance and causes draw on Michell Bearings’ damage guide and on standard engine-room practice.

Wiping

White metal smeared or melted in the load zone. Cause: the oil film was lost through low oil pressure, overload or overheating.

Fatigue cracking

A crazed pattern of cracks in the most heavily loaded area, sometimes with lining coming away. Cause: high dynamic loads or vibration.

Misalignment

Polished or scored at one end only. Cause: poor alignment or a worn neighbouring bearing. Check deflection.

Scoring

Lines running round the shell across its width. Cause: hard particles in the oil. Check filters and purifier performance.

Overlay corrosion

A dull, darkened overlay. Cause: water or acidic, degraded oil attacking the lead-based overlay.

Lacquer and heat marks

A brown lacquer on the hottest side of the bearing. Cause: oil oxidising at high temperature, usually above about 130°C.

Cavitation erosion

Pitted patches next to oil grooves and holes. Cause: rapid pressure swings in the oil film collapsing vapour bubbles.

Shell rotation

Scuffing on the back of the shell, with the oil hole out of line. Cause: poor shell crush or a fretted housing. This was the failure in both cases above.

Put every bearing reading on one trend

Log temperatures, oil results, deflections and open-up findings for each unit, and see the drift weeks before the alarm sounds.

Crankshaft deflection and main bearing alignment

Deflection readings show whether the main bearings still hold the crankshaft straight. A dial gauge between the crank webs is read as the engine is turned over. The IIMS method uses five readings per web: top dead centre, the two sides, and either side of bottom dead centre, where the connecting rod gets in the way. The TDC minus BDC difference shows vertical misalignment.

TPSBPBS

Readings at the same punch marks every time. Ship afloat, draughts recorded.

TDC–BDC difference by unit (illustrative, 1/100 mm)

1
2
3
4
5
6

Dashed lines mark an example maker’s limit. Unit 4 is outside it and off the fair curve, so check the main bearings on either side.

Plot the readings as a curve as well as checking each value. IIMS notes that a bearing lying well off a fair curve can need attention even when every reading is inside the limits. For how deflections fit into the wider overhaul plan, see our main engine overhaul schedule and inspection guide.

Bearing failure diagnosis: a step-by-step method

A hot bearing alarm is not the moment to improvise. A fixed sequence protects the crew first and the evidence second.

1

Slow down or stop as the maker directs

Take the load off. On an oil mist alarm, keep people away from the crankcase doors and relief valves.

2

Wait before opening the crankcase

Let the hot spot cool for the time in the engine manual. Opening early lets air in and risks a crankcase explosion.

3

Capture the data

Save temperature trends, the alarm log, load, rpm and lube oil pressure, all timestamped. Gard recommends keeping this record.

4

Look for metal

Check filters, the sump and the crankcase bottom for white metal flakes. Feel each bearing for heat and look for squeezed-out metal at the bearing edges.

5

Measure

Take bearing clearances, and deflections if alignment is in doubt. Compare them with the last open-up and the maker’s limits.

White metal found or clearance out of limits?
YesOpen the bearing up, read the damage pattern, check the journal for ovality and cracks, then find the root cause before renewing the shell.
NoCheck the sensor and the oil supply, take an oil sample, monitor more often and record the event against that unit.

Generator engines follow the same logic on a smaller scale. Our auxiliary engine and generator maintenance guide covers their routine bearing checks.

Bearing inspection and clearance checklist

Use this checklist for routine crankcase rounds and before departure after work on the running gear.

How Marine Inspection tracks engine bearing condition

Marine Inspection gathers every bearing signal for each unit in one place: temperature trends, oil results, deflections and open-up findings, each linked to the job in your planned maintenance system. The board below is illustrative.

Main engine bearing board · MV example1 unit flagged
UnitBearing temp trendBWMLast deflectionLast open-up
1SteadyNormal+0.04 mmCrosshead, good
2SteadyNormal+0.06 mmCrankpin, good
3SteadyNormal+0.03 mmMain, light scoring
4+4°C in 3 weeksRising−0.09 mmInspection job raised
5SteadyNormal+0.05 mmMain, good
6SteadyNormal+0.02 mmCrankpin, good
One record per bearingClearance, damage photos and shell history, unit by unit
Cross-signal flagsA temperature drift plus a bad deflection on the same unit raises one alert
Oil results linkedLab reports and water-in-oil readings sit beside the bearing data

Engine bearing failure: frequently asked questions

What are the first signs of engine bearing failure?

A slow rise in bearing temperature against the other units, a rising BWM reading, water or wear metals in the oil, white metal in the filters, and deflection readings that move off the curve.

Is bearing temperature monitoring enough?

No. Gard’s 2026 case shows normal readings right up to the failure. Combine temperature with oil mist detection, oil analysis, alignment checks and inspection.

What causes white metal wiping?

Loss of the oil film, usually from low oil pressure, a blocked oil hole, overload or overheating. The white metal softens and smears across the load zone.

Why does water in lube oil damage bearings?

It corrodes the overlay and weakens the oil film. Marine Insight quotes a typical maximum of 0.2 vol% water, with short spells up to 0.5 vol%.

How often should crankshaft deflection be taken?

Follow the engine maker’s interval, and also take readings after bearing work, groundings or a suspected alignment problem.

Bearings talk before they fail. Make sure someone hears them.

Trend every unit, link every finding to a job, and give your chief engineer one board for the whole running gear.