A dangerous goods unit is the one cargo item where a paperwork error can turn into a fire. What must be checked before the ship accepts a container, what changed on 1 January 2026, and what will a port State control officer ask to see? This guide is an IMDG Code dangerous goods inspection checklist for ships: the declaration, manifest, stowage and segregation, Document of Compliance, fire fighting readiness and PSC checks. It draws on TT Club articles, a carrier advisory on Amendment 42-24, a Tokyo and Indian Ocean MOU campaign questionnaire and a PSC deficiency code list, and it flags where sources are old or secondary. For wider fire safety findings, see our SOLAS fire safety inspection common failures and how to fix them.
IMDG Code Amendment 42-24: What Became Mandatory on 1 January 2026
Five areas of change the ship's documents and stowage plans must reflect
Amendment 42-24 became mandatory on 1 January 2026 and could be applied voluntarily from 1 January 2025. A TT Club article of 2 December 2025, citing NCB Hazcheck, counts over 60 revisions to the Dangerous Goods List, 11 new UN numbers, over 50 packing instruction updates and over 30 special provision changes. The table of changes below comes from a single carrier advisory (K Line, Oceania), which is a secondary summary, so check each point against the Amendment itself.
The same carrier advisory says that data sheets still referencing Amendment 41-22 after 1 January 2026 will be invalid and that shippers must update their templates. It is a carrier's view of shipper obligations and not IMDG Code text. Neither source describes a grace period.
Who Is Responsible for What: Shipper, Packer, Carrier and Ship
Why the declaration and the packing certificate are binding
TT Club states that each consignment must be correctly classified with all hazards named, that the shipper's declaration is a binding statement and that the packing certificate is a binding declaration of compliance. The ship cannot fix a wrong declaration, but it can see that documents and units do not match before accepting the unit. It also notes that incompatible goods must not be packed together and that training under chapter 1.3 is required for personnel handling, documenting or packing dangerous goods.
What Port State Control Has Asked About Dangerous Goods
A 2010 campaign questionnaire and the deficiency codes inspectors use
The best published questionnaire we reached is from the 2010 Tokyo and Indian Ocean MOU concentrated inspection campaign on harmful substances in packaged form (1 September to 30 November 2010). It is 16 years old and covers MARPOL Annex III more than the whole IMDG Code, but the items still describe what an inspector would naturally look for. It contained no specific segregation or fire fighting items beyond the IMDG stowage reference and the emergency procedures question.
| Item | What the questionnaire asked | Reference |
|---|---|---|
| Document of Compliance | Valid DoC for carrying dangerous goods | SOLAS II-2/19 |
| Transport documents | Correct technical name plus 'Marine Pollutant' for each substance | MARPOL III/4(1) |
| Packing certificate or declaration | Signed for each harmful substance | MARPOL III/4(2) |
| List or stowage plan | Substances and locations on board, with content per IMDG Code 5.4.3 | MARPOL III/4(3) |
| Stowage | Stowed per the list or plan, IMDG Code 7.1, the DoC and the Cargo Securing Manual | IMDG Code 7.1 |
| Labelling | Containers labelled as containing marine pollutants | MARPOL Annex III |
| Emergency procedures | Procedures for incidents with harmful substances, known to the crew | As cited |
We found no current Paris MoU or Tokyo MoU instruction on dangerous goods comparable to the Polar Code one, so we cannot say what the current inspection sequence is. The code list below was read on an AMSA page, and the Cayman note we read lists general fire safety inspection areas such as quick-closing valves, dampers and fixed system training.
| Code | Item |
|---|---|
| 12101 | Stowage, segregation, packaging of dangerous goods |
| 12104 | Dangerous Goods Code |
| 12107 | Fire protection, cargo deck area |
| 12112 | Dangerous goods or harmful substances in packaged form |
| 01126 | Document of Compliance, Dangerous Goods |
| 01135 | Documents for carriage of dangerous goods |
| 14304 | MARPOL Annex III stowage |
What Container Inspections Have Found: Old but Useful Numbers
Deficiency and stowage problem rates from a 2015 industry article
TT Club also reported that ICHCA surveyors found weak adherence to segregation requirements for incompatible chemicals at marine terminals, and that incompatible products stored close together can turn a small fire into a catastrophe. These are shore-side observations. We did not find ship-side statistics.
A Five-Step Acceptance Check Before a Dangerous Goods Unit Is Stowed
Documents, DoC, plan, walk-round and emergency readiness
The sequence is our summary of the sources above and is not a regulatory method. Combine it with your DG procedures and the Cargo Securing Manual. We did not obtain the IMDG segregation tables in chapter 7.2 or the text of SOLAS II-2/19 on fire protection, so check them in the Code before using this to decide a stow.
Training, Records and Emergency Readiness for Dangerous Goods
What TT Club and the campaign questionnaire say about people and procedures
Chapter 1.3 of the IMDG Code sets out training for personnel who handle, document or pack dangerous goods, according to TT Club. A 2015 TT Club article adds that function-specific training is required for shore-side dangerous goods staff, that the requirement is not being followed rigorously, as claims and container inspections show, and that carriers should ask shippers for training records. On board, the same logic applies to the officers who accept units and the crew who would respond to an incident.
The 2010 campaign questionnaire asked whether the vessel has procedures for incidents involving harmful substances and whether the crew know them. That is the nearest item to fire fighting readiness in the source, and it is general, so it leaves the detail to the ship's own plan and the Document of Compliance. A practical record set therefore holds the training dates of the cargo officers, the drill that practised a dangerous goods scenario, the personal protection inventory and the location of the manifest for responders. We did not obtain any text that sets a drill frequency for dangerous goods, so we do not give one.
Finally, keep the version of the Code in view. With Amendment 42-24 mandatory from 1 January 2026, the stowage plan template, the shipper's data and any internal checklist should all refer to the same edition, and any template that predates the amendment should be reviewed before the next loading.
IMDG Code Dangerous Goods Inspection Checklist
A checklist with a checkpoint type on each item
Use the checklist at acceptance, after loading and before departure. For wider inspection routines, see our ship inspection checklists, and for the certificate side see certificate tracking. It is our template and does not replace the IMDG Code.
| Item | What to check | Checkpoint type |
|---|---|---|
| Document of Compliance | Valid for the classes carried and available on board | Record |
| Dangerous goods declaration | Present for each unit, all hazards named, signed | Record |
| Container packing certificate | Present and signed for each packed unit | Record |
| Manifest or stowage plan | Lists substances and locations, primary and subsidiary hazards | Record |
| Segregation | Stowage matches the IMDG segregation requirements and the plan | Visual |
| Marks, labels and placards | Present, correct and visible on each unit | Visual |
| Securing | Units secured per the Cargo Securing Manual, no shifting or damage | Visual |
| Leaks and damage | No leaks, vapours or damaged packages | Visual |
| Temperature-controlled units | Control instruments working where required | Test |
| Fire protection, cargo area | Fixed and portable systems ready, quick-closing and shutdown arrangements tested | Test |
| Emergency procedures | Procedures on board and known to crew, personal protection available | Record |
| Training records | Shore and ship staff trained per IMDG Code chapter 1.3 | Record |
Six Dangerous Goods Gaps That Cause Trouble
What TT Club, the carrier advisory and the CIC point to
Keeping DG Checks, Photos and Follow-Up Tasks in One System
How a dated photo repository, task ownership and deadlines support dangerous goods compliance
Dangerous goods findings recur when the declaration, the stowage photo and the follow-up sit in different places. Marine Inspection supports a dated photo repository, observations turned into tasks with owners, deadlines and evidence, and certificate and equipment tracking. A dated photo of a stow and its placards, a task for a mismatched declaration with a named owner and due date, and a tracked Document of Compliance give the Chief Officer a record to show an inspector. It does not replace the IMDG Code or your DG procedures. Raise follow-ups through maintenance work orders, see inspection reports and see Marine Inspection pricing for plans.