A time charter is an agreement to hand a ship over in one condition and get her back in the same condition, less fair wear and tear. Everything else — the hire, the bunkers, the cargoes, the disputes — flows from how precisely those two moments are recorded. And they are recorded by two surveys: the on-hire survey when the vessel is delivered into the charter, and the off-hire survey when she is redelivered out of it. Between them sits months or years of trading, thousands of tonnes of bunkers, stevedores in a dozen ports, and every opportunity for damage that nobody witnessed. When the redelivery dispute arrives — and it frequently does — the arbitrators will not have the ship in front of them. They will have two survey reports, and the party whose report is vague, unsigned, or absent will lose the argument regardless of what actually happened. That is the whole discipline in one sentence: the on-hire and off-hire surveys are not administrative formalities, they are the evidential baseline that decides who pays. This guide covers what the charter party actually requires, the on-hire and off-hire surveys and the traps in their timing, the bunker survey, hold condition and the cleanliness standards that generate more off-hire disputes than any other cause, the difference between an off-hire survey and an off-hire event, and how to build the documentation that wins the argument. Because it all comes down to condition recorded at the right moment and retrievable years later, book a Marine Inspection demo to see vessel condition and inspection records managed in one place.

Commercial & operations · charter party surveys
Charter Party Inspection: Pre-Delivery and Re-Delivery Vessel Survey Guide
A guide for charterers and operators — what the charter party requires, on-hire and off-hire surveys and their timing traps, bunker surveys, hold cleanliness standards, off-hire survey versus off-hire event, and documenting to win the dispute.
On-hire survey
Delivery. Establishes the baseline — bunkers, condition, existing damage. On charterers' time.
The charter period
Everything that happens between is measured against the two reports
Off-hire survey
Redelivery. Compares against the baseline — same condition, fair wear and tear excepted. On owners' time.

What the Charter Party Actually Requires

Start with the words, because the obligations are more specific than most operators assume. The NYPE form — the dominant time charter — sets them out plainly, and the standard survey clause is worth reading closely. See condition reporting in a demo.

Condition on delivery
The vessel on delivery must be ready to receive cargo with clean-swept holds and tight, staunch, strong and in every way fitted for the service. That is the standard the on-hire survey exists to record.
Condition on redelivery
The charterer must redeliver the vessel in the same good order and condition as when she was placed at their disposal, ordinary wear and tear excepted. "Same as delivered" is only meaningful if delivery was documented.
The survey clause
Under NYPE, prior to delivery and redelivery the parties each appoint surveyors, for their respective accounts, who conduct joint on-hire and off-hire surveys not later than at the first loading port and last discharging port respectively, to ascertain the quantity of bunkers on board and the condition of the vessel.
A single joint report
One report is prepared on each occasion and signed by each surveyor — without prejudice to either surveyor's right to file a separate report setting out the items on which they cannot agree. Disagreement is anticipated by the form, not fatal to it.
Who pays for the time
The on-hire survey is on charterers' time; the off-hire survey is on owners' time. Each party pays its own surveyor. The logic is that each party bears the cost of establishing the position at the moment it takes on risk.

The BIMCO delivery and re-delivery surveys clause frames the purpose slightly more precisely than NYPE does — determining and agreeing in writing the condition of the vessel. That phrase carries the whole weight of the exercise. A survey that produces no agreed written record has not done its job, whatever the surveyor observed.

The Clause Trap Every Operator Should Know

One sentence in the NYPE survey clause does more damage than any other provision in the form, and it catches people every year.

If you do not attend, you are bound anyway
Under the standard clause, if either party fails to have a representative attend the survey and sign the joint report, that party is nevertheless bound for all purposes by the findings in any report prepared by the other party. Skipping the survey does not preserve your position — it surrenders it. The other side's unilateral report becomes the agreed factual record, and every subsequent argument starts from their version of the ship's condition.

This is why "we'll waive the survey to save time and cost" is one of the most expensive economies in chartering. The survey fee is trivial against a redelivery damage claim, and the party that attends holds the pen. If circumstances genuinely prevent attendance, the minimum protection is to appoint a local surveyor to attend on your behalf and sign, rather than to let the report be written without you.

The Timing Trap: Delivery Port Versus First Loading Port

The second recurring problem is where the survey happens. The clause says the survey shall be conducted not later than at the first loading port — but delivery itself often occurs somewhere else entirely, commonly dropping last outward sea pilot at the previous charter's last discharge port.

1
Delivery and survey can be far apart
Where delivery is at the last discharging port and the first loading port is a ballast voyage away, the gap between the moment risk transfers and the moment condition is recorded may be days or weeks of steaming.
2
Whatever happens in the gap is contested
Damage or deterioration arising between delivery and the survey belongs to whoever can prove when it occurred — which, absent a survey at delivery itself, is nobody. The ballast voyage becomes an evidential void.
3
It can cut either way
Owners may prefer a first-loading-port survey because it gives the crew the ballast voyage to finish cleaning holds; charterers may prefer it because any deterioration in transit lands on the owner. The interests are genuinely opposed, which is why it is negotiated rather than assumed.
4
Say it in the clause
The words "unless otherwise agreed" open the door. If the survey should be at the delivery port, or at both, or the bunker survey at one place and the condition survey at another, write it into the fixture rather than discovering the ambiguity in arbitration.

A real arbitration illustrates the point neatly. A vessel was delivered at Haldia after discharging coal, ordered to load grain at Vancouver, and her holds were rejected by inspectors for coal staining. Charterers argued owners were in breach because the holds were not fit for grain on delivery. The tribunal rejected the claim: the charter party was specific about how clean the holds had to be and when — on arrival at the first loading port — and the crew were entitled to clean during the ballast voyage after delivery, which they did properly. The wording decided it, not the coal.


The report is the ship, once she has sailed
Own the Condition Record on Every Delivery
On-hire and off-hire disputes are decided on documents written in an hour and relied on for years. Marine Inspection structures vessel condition reporting with photographs and timestamps, tracks damage and defects from the moment they are recorded through to closure, and keeps the delivery baseline retrievable when the redelivery argument starts. Book a 30-minute demo, or start a free trial today.

The Bunker Survey

Bunkers are the simplest part of the exercise and still a reliable source of dispute, because fuel is money and the quantities are large. The mechanism is straightforward once the commercial logic is clear.

Who owns the fuel
On delivery the charterer takes over and pays for the bunkers on board; they replenish throughout the charter; on redelivery the owner takes over and pays for what remains. Property in the bunkers moves with the ship.
What the surveyor does
Sounds the bunker tanks and calculates and certifies the exact quantity on board at delivery and at redelivery, so both transfers are priced against a measured figure rather than an estimate.
Quantity and price agreed
The parties agree the quantities and prices of fuel on board at delivery and redelivery in the charter. Under NYPE 2015 any difference in hire and bunkers is settled within five banking days of redelivery.
Where disputes come from
Redelivery quantities rarely match delivery quantities exactly, and the difference is settled by the charterer supplying additional bunkers or by financial adjustment. An accurate, certified survey is what turns a potential argument into an invoice.

The bunker survey is also the reason the condition survey usually happens at all — complete on-hire and off-hire condition surveys tend to be performed in conjunction with the bunker survey, because the surveyor is already on board. Operators who treat the bunker figure as the point and the condition report as a by-product have the priority exactly backwards.

Hold Condition: the Biggest Dispute Generator

Nothing in time chartering produces more off-hire arguments than cargo hold cleanliness, because the standard is verbal, the inspector is third-party, and the consequence is immediate. See hold condition records in a demo.

Hospital
Hospital clean
The highest standard: grain-clean plus fully intact paintwork on all hold and hatch cover surfaces including the tank top and all fixtures and fittings. Normally met only by ships trading specific cargoes exclusively, and rarely seen in the tramp trades.
Grain
Grain clean
The most common requirement by far. Free of all traces of previous cargo residues and transferable stains, free of loose rust scale, loose paint flakes and blisters and any other contaminants, thoroughly dry, and without infestation or strong odour. Required for most bulk and break-bulk — grains, soya, alumina, sulphur, cement, bauxite, concentrates, fertilisers.
Swept
Swept clean
Stevedores sweep the holds before completing discharge to minimise remaining residues. A redelivery standard rather than a loading one, and much less demanding than grain clean.
Shovel
Shovel clean and load on top
Shovel clean means no more than discharging what a mechanical shovel can reach — several tonnes may remain in each hold. Load on top leaves residues that also prevent a full inspection of the hold for damage, which matters at redelivery.

The standards are industry conventions, not legal definitions, and their interpretation varies widely by port — which is precisely the problem. The charterer typically sets the requirement based on the previous cargo, the next cargo, local regulations, and cargo-interest demands, and some regimes are notably stricter: Australian ports apply low biosecurity tolerance, particularly for grain. The IMSBC Code also stipulates hold cleanliness requirements for the cargoes it lists.

How Hold Disputes Actually Play Out

The typical hold clause puts the vessel off-hire from the moment she fails inspection until she is ready to pass re-inspection, with the related time and documented expenses for owners' account. That is a sharp, immediate financial consequence, and the arbitration record shows how it bites.

The standard is what the clause says
Where a ship must be delivered clean to a high standard such as grain or hospital clean and does not comply, it is irrelevant whether the holds were nonetheless suitable for the particular cargo actually loaded. The contractual standard governs, not the practical outcome.
Cleaning can be read as admission
In one dispute the holds passed three inspectors and failed a fourth. The tribunal accepted the fourth surveyor's findings and treated the master's decision to clean as acceptance that residues and rust were present — rejecting owners' argument that the inspectors were incompetent or unreasonable.
Soft rust versus hard rust
Removing soft, non-adhering rust is the crew's duty; removing hard, adhering rust is not something the crew can do. The distinction frequently determines whether a failure is the owner's breach or an unreasonable demand.
Prove the lost time
In London Arbitration 5/08 the charterers failed to establish any loss of time and so could not succeed either on off-hire or in damages. An off-hire claim needs demonstrated time lost, not merely a failed inspection.
Previous cargoes drive the risk
The cleaning burden depends heavily on what came before — petcoke, coal, cement, and concentrates are the notorious ones. Inspectors routinely ask for details of at least the previous three cargoes, so that history is itself a document that matters.
ILOHC as the escape valve
Charterers commonly have the option of paying a lump sum in lieu of hold cleaning at redelivery. Where a cleanliness standard cannot realistically be met, agreeing an ILOHC payment is better than promising a standard the ship will fail.

The practical lesson running through the case law is that precision in the clause beats argument after the fact. Where a term such as "grain clean" is used, the fixture should state clearly what it is agreed to mean, because how such terms are interpreted varies widely by port and by inspector. Charterers should also avoid promising redelivery to a cleanliness standard the vessel cannot realistically achieve, and use an ILOHC provision instead.

Off-Hire Survey Versus Off-Hire Event

A terminology confusion causes genuine commercial errors, and it is worth separating cleanly because the two things share a word and share nothing else.

The off-hire survey
A survey at redelivery recording bunkers, condition, visible damage, and the facts of handover. It is an evidential exercise at the end of the charter. It does not suspend anything.
An off-hire event
An operational occurrence during the charter that suspends the hire — machinery breakdown, crew deficiency, drydocking, detention, failed hold inspection. It is a financial mechanism in the middle of the charter.

Because time is the economic unit of a time charter, off-hire events are commercially heavy: a few days can represent a large sum in a firm market or a long charter, and off-hire ripples into bunkers, port costs, redelivery timing, sub-charters, cargo commitments, and downstream sale contracts. Different forms produce different results — some clauses suspend hire from the moment the event occurs, others only after a threshold period, some require actual loss of time, others put the ship off-hire for the event's duration regardless of whether the charterer's venture was delayed. Owners want narrow, precise wording to protect the hire stream; charterers want breadth so they do not pay for a ship that cannot perform. Neither should rely on assumptions for known risks such as piracy, sanctions, arrest, quarantine, hull fouling, regulatory detention, cyber incidents, or war-risk delays — those need specific wording.

Building Documentation That Wins

All of the above converges on one operational question: when the dispute arrives eighteen months later, what can you actually produce? See damage and defect tracking in a demo.

Attend and sign, always
The single highest-value action available. Appoint a surveyor, attend, and sign the joint report — or accept being bound by the other party's account of your ship.
Photograph the baseline
Comprehensive dated photographs of holds, hatch covers, tank tops, decks, and existing damage at delivery. Pre-existing damage documented at on-hire is damage the charterer never has to argue about at redelivery.
Record damage as it happens
Master's damage reports raised contemporaneously during the charter — particularly stevedore damage — are what the off-hire surveyor works from. Surveyors are provided with the master's damage reports at redelivery; if they do not exist, the damage looks like the charterer's problem or nobody's.
Keep the cargo history
Previous cargoes, cleaning carried out, chemicals used, and inspection outcomes. Inspectors ask for at least the last three cargoes, and the cleaning record is the owner's defence when a hold fails.
Log the time, precisely
Time of rejection, time cleaning started and finished, time of re-inspection and passing. Off-hire turns on demonstrated lost time, and imprecise timings lose recoverable hire in both directions.
Make it retrievable
A report that exists in an inbox on a superintendent's old laptop does not exist. The delivery baseline must be findable years later by someone who was not there.

The through-line is that charter party inspection is a documentation discipline wearing a technical costume. The surveyor's skill matters, but what decides the money is whether the condition at two specific moments was captured precisely, agreed in writing, supported by photographs and timings, and still retrievable when the claim lands. Operators running multiple vessels through rolling charters accumulate that material constantly — delivery baselines, damage reports, cleaning records, inspection outcomes, bunker figures — and the value of it collapses the moment it is scattered across emails and local drives. Held in one system, timestamped and searchable, it is the difference between settling a redelivery claim and defeating it. Book a demo to see condition, damage, and inspection records as one retrievable system.

Frequently Asked Questions

What is an on-hire survey?
A survey conducted when a vessel is delivered into a time charter, recording the quantity of bunkers on board and the condition of the vessel, including any existing damage. It establishes the baseline against which the off-hire survey at redelivery is compared. Under NYPE the parties each appoint surveyors for their own account and conduct the survey jointly, not later than at the first loading port, and the time is for charterers' account.
What happens if a party does not attend the survey?
Under the standard NYPE survey clause, a party that fails to have a representative attend and sign the joint report is nevertheless bound for all purposes by the findings in any report prepared by the other party. Skipping the survey surrenders your position rather than preserving it, which is why appointing a local surveyor to attend on your behalf is the minimum protection.
What condition must a vessel be redelivered in?
In the same good order and condition as when she was placed at the charterer's disposal, ordinary wear and tear excepted. That obligation is only enforceable to the extent delivery condition was documented — which is what makes the on-hire survey the foundation of any redelivery claim.
What is grain clean?
The most common hold cleanliness standard: holds free of all traces of previous cargo residues and transferable stains, free of loose rust scale, loose paint flakes and blisters and other contaminants, thoroughly dry, and without infestation or strong odour. It is required for most bulk and break-bulk cargoes. Hospital clean is stricter, adding fully intact paintwork throughout; swept clean and shovel clean are considerably less demanding.
What happens if the holds fail inspection?
Typical clauses place the vessel off-hire from the moment she is found dirty and unacceptable for loading until she is ready and accepted, with the related time and documented expenses for owners' account. However, an off-hire claim requires demonstrated loss of time — in London Arbitration 5/08 the charterers failed because they could not establish any time lost.
What is ILOHC?
A lump sum paid in lieu of hold cleaning at redelivery. Where a vessel cannot realistically meet a promised cleanliness standard on redelivery, agreeing an ILOHC payment is better practice than committing to a standard the ship will fail and generating a dispute.
What is the difference between an off-hire survey and an off-hire event?
An off-hire survey is the evidential survey at redelivery recording bunkers, condition and visible damage. An off-hire event is an operational occurrence during the charter — breakdown, crew deficiency, drydocking, detention, failed hold inspection — that suspends the payment of hire. They share a word and nothing else.
Why do bunker surveys matter?
Because the charterer takes over and pays for bunkers on delivery and the owner takes them back on redelivery, and the quantities rarely match. The surveyor sounds the tanks and certifies the exact quantity at each end, so the difference is settled by additional bunkers or financial adjustment against a measured figure. Condition surveys are usually performed in conjunction with the bunker survey.

Two moments decide the money
Capture Delivery and Redelivery Condition That Holds Up
Structured condition reporting with photographs and timestamps, damage and stevedore-damage reports raised as they happen, cleaning and cargo history, defect tracking through to closure, and every delivery baseline retrievable years later when the redelivery claim arrives. Marine Inspection turns charter party inspection from scattered paperwork into evidence you can produce on demand. Book a tailored demo, or start a free trial today.