Class Inspection Summaries
Generate comprehensive class survey reports with findings, recommendations and condition status. Automated tracking of annual, intermediate and special surveys with due date monitoring.
Streamline regulatory reporting with automated audit documentation, class inspection summaries and IMO-compliant document generation. Generate flag state reports, Port State Control documentation and ISM audit packages with complete non-conformity tracking and corrective action management.
Instant generation • PDF export • Audit ready
Comprehensive audit report templates for DPAs, fleet managers and compliance officers — from survey findings to signed-off corrective actions.
Generate comprehensive class survey reports with findings, recommendations and condition status. Automated tracking of annual, intermediate and special surveys with due date monitoring.
Export compliance documentation in IMO-standard formats for regulatory submissions. Pre-formatted templates for MARPOL, SOLAS, ISM and MLC reporting requirements.
Document audit findings, track corrective actions and verify close-out status. Complete audit trails with evidence attachments and approval workflows.
MarineInspection generates comprehensive class survey reports covering annual surveys, intermediate surveys, special surveys, docking surveys, machinery surveys and bottom surveys. The system tracks survey windows, maintains condition of class records, documents surveyor findings with photo evidence and monitors recommendations requiring attention — with automated due date calculations ensuring timely completion within class society credit periods.
Surveyor findings documented with photos and recommendations
Export compliance documentation for all major IMO conventions including MARPOL (marine pollution), SOLAS (safety of life at sea), ISM Code (safety management), ISPS Code (maritime security), MLC 2006 (maritime labour) and the BWM Convention (ballast water management). MarineInspection provides pre-formatted templates matching regulatory requirements, auto-populates vessel and company data, and generates submission-ready documents for flag state administrations and recognized organizations.
Formats accepted by IMO, USCG, EMSA and other regulators
Track audit findings from identification through close-out with comprehensive non-conformity management. MarineInspection documents finding details, severity classification (major/minor NC, observation), root cause analysis, corrective action plans, responsible parties, target completion dates and verification evidence — maintaining complete audit trails with timestamps and generating NCR status reports meeting ISM Code and class society requirements.
Timely close-out per ISM Code and class society requirements
Audit readiness across the fleet — with less preparation and complete visibility.
Generate comprehensive audit packages instantly from inspection data. When auditors arrive, produce complete documentation including certificates, survey records, drill logs and maintenance histories without scrambling through paper files.
Export documents in formats accepted by flag state administrations, classification societies and Port State Control authorities. Pre-formatted templates ensure compliance with IMO, USCG, EMSA and other regulatory body requirements.
Track every finding from identification to close-out with full audit trails. Demonstrate continuous improvement to auditors with documented root cause analysis, corrective actions and verification evidence meeting ISM Code requirements.
Common questions about audit and compliance reporting.
MarineInspection generates class survey reports, ISM internal and external audit reports, flag state inspection reports, Port State Control preparation documents, ISPS security audit reports, MLC compliance summaries and emission reporting documentation for IMO DCS and EU MRV requirements.
Reports export as branded, professionally formatted PDFs for auditors and regulators, and as Excel or CSV for data analysis. IMO-standard document formats are used for regulatory submissions, and every export can carry your company logo and styling — accepted by flag states, class societies and PSC authorities.
Each finding is logged with severity classification (major NC, minor NC or observation), root cause analysis, a corrective action plan with a responsible party and target date, and verification evidence at close-out. The full lifecycle is timestamped, NCR status reports are generated automatically, and overdue actions raise alerts — meeting ISM Code and class society requirements.
Yes. Templates can be tailored per audience — a full evidence package for auditors, an executive summary for management, or a submission-ready document for a flag state. Custom branding, section selection and level of detail are all configurable, and saved templates can be reused across the fleet.
Stop manual report preparation and scattered compliance documentation. Connect your vessels to MarineInspection for automated audit report generation, IMO-compliant document export and comprehensive non-conformity tracking.