Structural Integrity
Complete checklists for frames, stringers, bulkheads and critical stress points with crack detection.
Comprehensive hull inspection software with ultrasonic testing reports, corrosion monitoring, coating condition tracking and structural integrity analysis for optimal vessel safety and compliance.
Connect ultrasonic thickness gauges directly to the app for real-time data capture, eliminating manual entry errors and ensuring accurate hull thickness documentation.
Direct gauge integration with automated data logging and Bluetooth connectivity.
Generate detailed corrosion maps and thickness profiles with color-coded visualization.
Monitor corrosion progression over time with automated alerts and trend analysis.
1,248 readings auto-logged this survey — zero manual entry
Pre-configured inspection templates for hull sections, ballast tanks and structural components with photo documentation and corrosion tracking.
Complete checklists for frames, stringers, bulkheads and critical stress points with crack detection.
Track coating condition, paint specifications and degradation with PSPC standard ratings.
Generate professional PDF reports with photos, thickness data and compliance documentation.
Capture and annotate inspection photos with GPS location, timestamps and severity ratings.
Identify and track corrosion areas with photo evidence, severity classification and progression monitoring.
Schedule coating maintenance and steel repairs based on inspection findings and service intervals.
Streamline your hull inspection workflow with digital checklists, ultrasonic testing integration and automated reporting.
Pre-configured inspection templates for different hull areas with custom fields and required photos.
Direct integration with ultrasonic thickness gauges for automatic data logging and measurement tracking.
Generate visual heat maps showing thickness distribution and corrosion hot spots across hull sections.
Comprehensive hull inspection reports with all UT data, photos, findings and class society compliance documentation.
Complete inspection solution for all hull structures, tanks and critical areas.
Improve structural safety, stay class-compliant and cut survey time with digital hull inspections.
Digital checklists and direct UT capture eliminate manual data entry and re-typing.
Early corrosion detection enables targeted touch-ups before costly steel renewal is needed.
Structural issues caught early protect crew, cargo and the environment.
Inspect all hull structures from a single platform with ultrasonic testing and corrosion tracking.
Connect thickness gauges directly for automated data capture and instant measurement recording.
Track coating condition over time and schedule recoating based on degradation rates.
Generate compliant reports meeting ABS, DNV, Lloyd's Register and other class requirements.
Corrosion trends monitored across every connected vessel
See how our hull inspection software is transforming structural integrity management.
“The ultrasonic testing integration saved us days of manual data entry. The automated corrosion mapping helps us prioritize repairs efficiently and stay compliant.”
“We've streamlined our hull inspection process by 60%. The photo documentation and thickness tracking make class surveys straightforward and well-documented.”
“The coating condition tracking is excellent. We can now plan drydock work more effectively and extend coating life through targeted maintenance.”
Comprehensive inspection guidance for different roles and vessel types.
Get answers to common questions about our hull inspection and structural integrity system.
Marine Inspection AI supports all major hull inspection types including ultrasonic thickness gauging, corrosion surveys, coating condition assessments, structural integrity checks, tank inspections and damage surveys. The software includes specialized checklists for different hull areas.
Yes. Most common digital UT gauges connect via Bluetooth for automatic reading capture — each measurement lands on the right checklist point with location, frame number and timestamp, eliminating manual transcription errors entirely.
Report templates follow the documentation formats accepted by major class societies including ABS, DNV and Lloyd's Register — thickness tables, diminution calculations, photo evidence and surveyor signatures are all included, exportable as PDF.
Every flagged area is logged with photos, severity classification and measurements. On each subsequent survey the system compares readings against previous values, plots the diminution trend and raises alerts when a location approaches its minimum allowable thickness.
The software is ready the same day — import your vessel particulars and start inspecting immediately. Pairing UT gauges takes minutes, and our team helps set up vessel-specific hull section templates during onboarding.
Start managing your hull inspections today with our comprehensive ultrasonic testing and corrosion monitoring system. Improve safety, ensure compliance and reduce maintenance costs.
✓ Quick setup process • ✓ Expert technical support • ✓ Flexible pricing