Annex & Regulation Tracking
Monitor compliance across all MARPOL annexes and IMO conventions with automated tracking systems. Real-time alerts for compliance deadlines, certificate renewals and inspection intervals.
Streamline International Maritime Organization compliance with automated audit tracking, annex monitoring and digital reporting. Maintain regulatory adherence across MARPOL annexes, SOLAS requirements, ISM Code and international maritime conventions — for vessel operators, compliance officers and fleet managers.
Digital reports • 24/7 access • Real-time updates
Comprehensive regulatory monitoring through automated systems — from annex tracking to cloud-based documentation.
Monitor compliance across all MARPOL annexes and IMO conventions with automated tracking systems. Real-time alerts for compliance deadlines, certificate renewals and inspection intervals.
Generate and submit IMO-compliant reports digitally from any device. Pre-built templates for statutory certificates, Port State Control inspections and audit findings.
Store all compliance documentation in secure cloud storage with vessel-to-shore synchronization. Instant retrieval during Port State Control inspections and audits.
MarineInspection tracks compliance across all six MARPOL annexes covering prevention of pollution by oil (Annex I), noxious liquid substances (Annex II), harmful packaged substances (Annex III), sewage (Annex IV), garbage (Annex V) and air pollution including sulfur emissions and energy efficiency (Annex VI) — with equipment checklists, operating parameter tracking, maintenance requirements and complete documentation for each annex.
Automated compliance monitoring with regulatory deadline alerts
The Safety of Life at Sea (SOLAS) Convention establishes minimum safety standards for vessel construction, equipment and operation. MarineInspection tracks SOLAS requirements including construction standards for hull, machinery and equipment, lifesaving appliances such as lifeboats and life rafts, fire protection and detection systems, radio communications equipment, navigation safety systems including ECDIS and voyage data recorders, and cargo safety for dangerous goods.
Compliance documentation, inspection schedules and maintenance records
The International Safety Management (ISM) Code requires shipping companies to establish safety management systems documenting procedures, responsibilities and emergency preparedness. MarineInspection supports ISM compliance through SMS documentation, designated person ashore responsibilities, hazard identification and risk assessment, maintenance and inspection planning, non-conformity and corrective action tracking, and internal audit scheduling — with complete document control and continuous improvement processes.
Safe ship operations and pollution prevention, fully documented
Every convention, every certificate, every audit — tracked in one place.
Tracks all applicable IMO conventions including MARPOL (marine pollution), SOLAS (safety of life at sea), ISM Code (safety management), ISPS Code (maritime security), MLC 2006 (maritime labour) and the Ballast Water Management Convention.
When Port State Control officers board, crew instantly retrieve statutory certificates, oil record books, garbage record books, ballast water record books, ISM documentation and maintenance records from cloud storage.
Automated compliance calendars calculate renewal dates from last survey dates, vessel construction dates and operational requirements — with alerts 90, 60 and 30 days before certificates expire.
Common questions about IMO audit automation and compliance management.
MarineInspection tracks IMO compliance by monitoring MARPOL, SOLAS, ISM, ISPS, MLC, BWM and other conventions. It centralizes statutory requirements, certificates, survey dates and equipment checks with automated calendars and alerts to ensure continuous, flag-state-specific compliance.
Any vessel subject to IMO conventions — cargo ships, tankers, bulk carriers, container ships, offshore support vessels, passenger vessels, yachts and workboats. Requirements are configured per vessel type, tonnage, flag state and trading area, so each ship only tracks the conventions and certificates that actually apply to it.
Yes. All statutory certificates, record books, ISM documentation and maintenance records are instantly retrievable from cloud storage when PSC officers board. Pre-inspection readiness checklists highlight expiring certificates and open deficiencies before arrival, reducing the risk of detainable findings.
Pre-built, IMO-compliant report templates eliminate manual form-filling, and findings captured onboard sync instantly to shore. Audit evidence — photos, checklists, certificates and corrective actions — is compiled automatically into submission-ready reports, cutting audit preparation from days to hours.
Stop manual compliance tracking and paper documentation. Connect your vessels to MarineInspection for automated regulation monitoring, digital reporting and cloud-based documentation — continuous IMO compliance across your fleet.